If you're rolling a single cube, then ...
-- There are 6 possible out comes.
-- One of them (5) is a multiple of 5 .
-- The probability of rolling it is (1/6) = <em>16-2/3 %</em> .
If everything is acting perfectly random, then ion 100 rolls,
you'd expect to succeed 16 or 17 times.
If you're rolling a pair of cubes, then ...
-- There are (6 x 6) = 36 possible outcomes.
-- There are seven ways to get a multiple of 5.
(1+4), (4+1), (2+3), (3+2), (4+6), (6+4), (5+5)
-- The probability of rolling one of those is
(7/36) = <em>19-4/9 %</em> .
If everything is acting perfectly random, then in 100 rolls,
you'd expect to succeed 19 or 20 times.
Answer:
6x +2x
Step-by-step explanation:
when the number= x, you can just form the equation as per usual. 6x = a number times 6; 2x = a number times 2.
x is used bc the number is an unknown value. only x can be used bc it is stated the same number. hsing different alphabets such as y or z indicates the unknown value ia different.
The line
is already written in the
form. This means that
is the slope. If two lines are perpendicular, their slopes are the anti-inverse of each other, i.e. their product is -1.
So, our perpendicular line has a slope of 
Finally, we want a line passing through (1,1) with slope
:

Answer:
The distance from point A to the top of the building is 5
feet
The Height of the Skyscraper is 5 feet
Step-by-step explanation:
Given
Let Top point of building be point C
Also Let Base of the building be point B
Distance from point A to base B of the building AB= 5 feet
∴ It makes a Right angle triangle
Also ∠ACB = 45°
Also tan 45° = 1
Now tan ∠ACB =
∴ AB= BC =5 feet
The Height of the Skyscraper is 5 feet
Now Triangle ABC is right angle triangle with right angled at B
So by Pythagoras theorem
AC= 
The distance from point A to the top of the building is 5
feet
Answer:
7.8. 10 ^ 3 m / s
Step-by-step explanation:
The computation of the average speed in m/s is shown below:
The average speed equation is
= ΔS ÷ Δt;
As We know that
an entire revolution would be40,000 km
and a satellite takes 85 minutes to complete a revolution,
So,
ΔS = 40,000 km = 40,000,000 m
Δt = 85 min = 5 100 s
Now the average speed is
= 40 000 000 ÷ 5 ÷ 5 100
= 7843.14 m / s
= 7.8. 10 ^ 3 m / s