Hi there! There was a strong sense of forlornness and desolation that dominated Europe after WWI. In other words B. devastated.
Answer:
people blame others because they can't tolerance other's ideas. they think only their opinion is correct. it is a problem with his atitudes.
Explanation:
Answer:
The correct statements are ; B , C and D
Explanation:
Applying the tentative acceptance of Hypothesis the correct statements that properly describe the discovery of Neptune are :
<em>The relationship between the mathematical models used in the formulation of the Neptune hypothesis and the behavior of the planet Uranus are part of what makes the hypothesis internally coherent.
</em>
<em>The effects of interplanetary gravitational forces implied by the Neptune hypothesis contributed to the internal coherence of the hypothesis.
</em>
<em> The movement of the planet Uranus was explained by the hypothesis of an eighth planet.</em>
These statements properly describe the discovery of Neptune because they fulfil the basis on which tentative hypothesis is acceptable ( i.e. there is presence of Internal coherence which helps strengthen a hypothesis )