Do you have a picture or is that it?
To solve for how much it would cost, we have to solve for the volume of the slab first, then multiply it by the given price of concrete.
Solving for the volume of the slab:
Since the given price is in cubic yard, it is easier to convert the given measurements from feet to yards first. Using the relation: 1 ft = 0.333 yd:
17 ft = 5.67 yards
2 ft = 0.67 yards
17ft x 17ft x 2ft = 5.67 yd x 5.67 yd x 0.67 yd = 21.54 yd^3
Multiplying this by $40.00 / yd^3:
21.54 x 40 = 861.59
Therefore, it will cost $861.59 to pour the slab.
Answer:
2) 7:1
Step-by-step explanation:
I believe this is the answer
<h2>
Answer: 241 total Parking spaces</h2>
Step-by-step explanation:
56 open on first level
there are 4 more on the 2nd than there are the first: 60
10 more on 3rd than on 2nd: 70
55 total on the forth floor, add 56+60+70+55