1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Yuki888 [10]
3 years ago
12

Trent is fishing from a pier.

Mathematics
1 answer:
snow_tiger [21]3 years ago
4 0
To estimate the distance between the tip of his fishingrod which is above the water and the hook which is below the water, you will need to estimate the absolute values of both distances.
|53 3/4| + |12 2/3|54 + 1367 ft
Trents estimate is not reasonable because you would around both of these values up to the next whole number making it greater than 65.
You might be interested in
The the slope of a line is 2. Use the coordinates (3,10) of the labeled point to find the point slope equation of the line.How?
Ipatiy [6.2K]
The point slope equation of a line with slope m through point (h, k) is
  y - k = m(x - h)

You have m = 2, h = 3, k = 10. Put those numbers in their place in the equation.
  y - 10 = 2(x - 3)
3 0
3 years ago
7. The cost of 2 notebooks and 4 folders is
KATRIN_1 [288]

Answer: B (The cost of a notebook is $0.75, and the cost of a folder is $0.25.)

Step-by-step explanation:

No need for explanation. i know i’m right!!

5 0
3 years ago
Use the drawing tools to form the correct answers on the graph. Plot the vertex and the axis of symmetry of this function: f(x)
CaHeK987 [17]

Answer:

Axis of Symmetry: x = 3

Vertex: (3, 5)

Step-by-step explanation:

Use a graphing calc.

6 0
4 years ago
Read 2 more answers
I need help on all of this too
Dmitriy789 [7]
Here’s a picture of the answer

5 0
3 years ago
Alees and Emma design an office park in 28 weeks. Each architect spends 19 hours each week on this project. What is the total nu
olchik [2.2K]

Alees and Emma spend 1064 hours together

<em><u>Solution:</u></em>

Given that, Alees and Emma design an office park in 28 weeks

Each architect spends 19 hours each week on this project

To find: Total number of hours the architects work on this project

From given,

Total number of weeks = 28

Each architect spends 19 hours each week

Therefore,

Time spent in one week by Alees = 19 hours

Time spent in one week by Emma = 19 hours

<em><u>Total number of hours the architects work on this project</u></em>

Total\ number\ of\ hours = (19 \times 28) + (19 \times 28)\\\\Total\ number\ of\ hours = 532 + 532\\\\Total\ number\ of\ hours = 1064

Thus, they spend 1064 hours together

7 0
4 years ago
Other questions:
  • Solve the compound inequality. <br><br><br><br> 5x – 11 &lt; –11 or 4x + 2 &gt; 14
    8·1 answer
  • Si un jugador de baloncesto encesta 8 lanzamientos 12 intentos, ¿cuántos tienen que hacer para lograr 20 canastas mantener el mi
    15·1 answer
  • What is the slope perpendicular to y=-3
    12·1 answer
  • Donald bought a box of golf balls for $9.27. There were 18 golf balls in the box.
    5·1 answer
  • 3. The amount of hot chocolate dispensed by a hot chocolate machine is normally distributed with a mean of 16.0 oz and a standar
    7·1 answer
  • A diet food company is attempting to create a non-carb brownie composed entirely of fat and protein. The brownie must weigh at l
    6·1 answer
  • The double number lines show the ratio of cups to gallons
    8·1 answer
  • 24/514.8<br> I really need help on this question please help me<br> I'm begging thanks :)
    10·1 answer
  • Whats 72/20 as a proper fraction... im lazy.
    12·2 answers
  • Solve this sum. ....​
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!