1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Pie
3 years ago
11

Solve. 4 – d < 4 + d d > 8 d > 0 d > –8 d > –4

Mathematics
1 answer:
yaroslaw [1]3 years ago
3 0

Answer:

-2d + 4 < 4

-2d < 0

d > 0

answer is b

You might be interested in
The degree of a polynomial is
scoundrel [369]
The degree of a polynomial is<span> the highest </span>degree<span> of its terms when the </span>polynomial is<span> expressed in its canonical form consisting of a linear combination of monomials.</span>The degree<span> of a term is the sum of the exponents of the variables that appear in it.</span>
5 0
3 years ago
Solve help help ASAP
marissa [1.9K]

Answer:

It's B, -11/12

Step-by-step explanation:

6 0
3 years ago
A triangle has sides of length 3 cm and 3 cm. What can be concluded about the length of the third side?
mrs_skeptik [129]

Answer:

that its 3cm

Step-by-step explanation:

7 0
2 years ago
Is the following acute obtuse or a right triangle
Murrr4er [49]

Answer: Obtuse

Would appreciate brainly <3

6 0
2 years ago
Read 2 more answers
8 men will take 10 days to build a wall 150 metres long. After the men had started working for 6 days, they were told that the w
Mashutka [201]
First, find out how much each man works. If eight men take 10 days to build 150 m of wall, then that means that it takes 80 man days to build 150 m. One Man day is then 150÷80, in other words 1.875. If eight men have already been working for six days, then they have spent 8×6 man days, 48. 48 men days times 1.875 m of wall per man day equals 90 m of wall have been built. So, you have four days left to build the remaining 60 m of wall as well as 45 extra meters, in other words, 105 m total. 105 m divided by four days equals 26.25 m need to be built every day. Since one man builds 1.875 m of wall every day, to find the number of men total you need for the last four days, take 26.25÷1.875, Which equals 14 exactly. 14 is not the answer however, because it’s asking how many more men you need. Since you already have eight, you need six more to make 14

The answer is six more men
3 0
2 years ago
Other questions:
  • A cone that has volume 1026.25mm^3 and height 20mm. Find the radius of the cone
    15·2 answers
  • What is 7/27 simplified?
    10·2 answers
  • Is (-3.4) a rational number? And why is (-3.4) a rational number?
    10·1 answer
  • Please help 15 points and brainliest!
    9·1 answer
  • PLEASE HELP I WILL GIVE BRAINLIEST
    10·1 answer
  • Using the system below, find the maximum value using the given f(x,y) function
    10·1 answer
  • A health food store sells dried peaches (p) for $4 per pound and dried cherries (c) for $5 per pound. A six pound mixture of the
    15·1 answer
  • If x=-4 what is the value of the following expression?
    8·1 answer
  • The image of point (−3, 5) under translation T is (6, -8). What is the image of point (4, 7) under the same translation?
    13·2 answers
  • Lena starts a spelling test at 12:15 P.M. The test is 35 minutes long. After the spelling test, Lena has art class for 1 hour. W
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!