1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alisiya [41]
4 years ago
12

Which earned value management (evm) agency is responsible for ensuring evm is applied with integrity and is an effective process

?
Business
1 answer:
finlep [7]4 years ago
4 0

Defense Contract Management Agency (DCMA) is the EVM (earned value management) agency that is responsible for ensuring EVM is applied with integrity and is an effective process. The Earned Value Management is a project management measure that tracts performance and process.  Earned Value is equal to the % of completed work X the budget for work to be completed.

You might be interested in
The action of blocking time when a physician is unavailable is referred to as setting up an appointment:
tensa zangetsu [6.8K]
I believe the answer is plan
3 0
3 years ago
A coffee shop owner blends a gourmet brand of coffee with a cheaper brand. The gourmet coffee usually sells for ​$9.00 per pound
AleksandrR [38]

Answer:

15lbs of gourmet coffee and 5lbs of cheap coffee.

Explanation:

To solve this problem, we will use the substitution method. Step by step explanation:

1. Defining the variables:

  • G: For gourmet coffee
  • C: For cheap coffee

2. Setting up the equations:

We need to find a combination of G and C that will result in 20 pounds worth $8.50 per lbs. As such, we have:

  1. G + C = 20lbs
  2. $9.00G + $7.00C = $8.50/lbs x 20lbs

3. Solving equation 1 for any of the variables. We will go with variable G:

  • G = 20 - C

4. Substituting variable G in equation 2 to find C:

  • 9(20 - C) + 7C = 8.5 * 20\\180 - 9C + 7C = 170\\180 - 170 = 9C - 7C\\10 = 2C\\\frac{10}{2}=C\\C = 5

5. Substituting variable C in equation 1 to find the value of G:

  • G + 5 = 20\\G = 20 - 5\\G = 15

Then, we need <em>15lbs</em> of gourmet coffee and <em>5lbs</em> of cheap coffee to have <em>20lbs</em> of coffee worth <em>$8.50/lbs.</em>

3 0
3 years ago
A surplus of labor is synonymous with which of the following?
gregori [183]
The correct answer is letter B. Unemployment is synonymous with surplus of labor. This concept was used by Karl Marx when he critiqued political economy. Surplus of labor is ;abor that is performed in excess of the labor necessary. That purpose the purpose of producing the means of livelihood of the worker.

7 0
3 years ago
Write a paragraph on needs and wants of the ancient communities
Anna007 [38]

Answer:

Introduction

Info on needs and wants of ancient communities

.Info on system practiced in exchanging their goods

Logical arrangement of facts

Conclusion

4 0
2 years ago
A quantitative method used to evaluate multiple locations based on total cost of product or service operations is called:_______
BaLLatris [955]

The quantitative method used to evaluate multiple locations based on total cost of product or service operations is called a <u>break even analysis</u>.

<h3>What is a break even analysis?</h3>

This refers to the management tool that is used to calculate the level of sales needed to cover all costs of production. It helps to further sales to generate a positive safety margin and hence profit for the business.

Hence, the quantitative method used to evaluate multiple locations based on total cost of product or service operations is called a break even analysis.

Read more about break even analysis

brainly.com/question/21137380

#SPJ1

6 0
2 years ago
Other questions:
  • How does Wikipedia work? What is different about this operation from other encyclopedias?
    6·2 answers
  • What is the smallest acceptable annual income from a project which has a?
    15·1 answer
  • The Great Fish Taco Corporation currently has fixed operating costs of $15,000​, sells its​ pre-made tacos for $6.00 per​ box, a
    13·1 answer
  • Any suggestions on a good movie?
    7·2 answers
  • Although Lenin wanted to establish, for the short term, a state-capitalist economic system in Russia, which resembled the succes
    12·1 answer
  • You invest $100 in a risky asset with an expected rate of return of 0.11 and a standard deviation of 0.20 and a T-bill with a ra
    8·1 answer
  • Mark Price, the new productions manager for Speakers and Company, needs to find out which variable most affects the demand for
    12·1 answer
  • Phil put down the phone and told Alice, "I just love that customer. I got another big order, and they just keep on coming." Phil
    10·1 answer
  • Difference between luna and sol?​
    9·1 answer
  • Most of a distribution manager's decisions must balance cost reduction against which other benefit?
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!