Its 8 divided by 3 which equals 2.6
Answer:
multiply the length value by 1000
1 Kilometers ⋅ 1000 = 1 meters
Its a triangle.
<span>Area = 1/2bh
b=11
h=4
a = 1/2(11*4) = 1/2(44)= 22
Are looking for that?
</span>
Answer:
So the equation and solution will be:
Total time taken = 3 × number of shirts + 19.87 min (setup time)
= 3 × 143 + 19.87


Step-by-step explanation:
From the question statement, it is clear that
- screen-printing a batch of shirts requires 3 minutes per shirt in addition to 19.87 minutes of initial set-up time.
we have to determine how long does it take to screen-print a batch of 143 shirts.
so the equation and solution will be:
Total time taken = 3 × number of shirts + 19.87 min (setup time)
= 3 × 143 + 19.87

min