Answer:
The measure of z is 17
Step-by-step explanation:
90 plus 73 equals 163
180 minus 163 equals 17
Answer: 5.5%
Step-by-step explanation:
Since the money invested has grown to $8300 and the principal was $600, this means the interest is:
= $8300 - $6500
= $1800
Simple interest = (Principal × Rate × Time)/100
1800 = (6500 × Rate × 5)/100
Cross multiply
1800 × 100 = 32500 × Rate
Rate = 180000/32500
Rate = 5.5%
Answer:
l think the problem of the is your work is not of the number l got.
x=2
Answer:
d. 15
Step-by-step explanation:
Putting the values in the shift 2 function
X1 + X2 ≥ 15
where x1= 13, and x2=2
13+12≥ 15
15≥ 15
At least 15 workers must be assigned to the shift 2.
The LP model questions require that the constraints are satisfied.
The constraint for the shift 2 is that the number of workers must be equal or greater than 15
This can be solved using other constraint functions e.g
Putting X4= 0 in
X1 + X4 ≥ 12
gives
X1 ≥ 12
Now Putting the value X1 ≥ 12 in shift 2 constraint
X1 + X2 ≥ 15
12+ 2≥ 15
14 ≥ 15
this does not satisfy the condition so this is wrong.
Now from
X2 + X3 ≥ 16
Putting X3= 14
X2 + 14 ≥ 16
gives
X2 ≥ 2
Putting these in the shift 2
X1 + X2 ≥ 15
13+2 ≥ 15
15 ≥ 15
Which gives the same result as above.
Answer:
<u>108</u>
Step-by-step explanation:
Volume of a Square Pyramid :
- V = 1/3 x Base Area x Height
Solving :
- V = 1/3 x (6)² x 9
- V = 36 x 3
- V = <u>108</u> cubic centimeters