REM sleep than in NREM-1 sleep
:) ++
Identify processes for change
Explanation:
BPM or Business Process management refers to the technique employed by business enterprises to improve their work process and thus increase their output efficiencies. Since business includes a set of task to be completed in synchronisation with one another, hence BPM reduces the latency between each of these tasks by streamlining the whole procedure by making some requisite changes.
The whole process is completed in 6 to 7 steps. 1st of all the steps remain the Design part.
Design part includes the act to identify the process which needs to be changed. This process is also termed as evaluation. Later other steps ride on the success of this step.
Answer:
perceptual sets.
Explanation:
Perceptual set: In psychology, the term perceptual set is determined as an individual's susceptibility or predisposition to perceive or recognize specific things in a certain manner or way. In other words, the perceptual set is described as an individual's propensity to notice only a few aspects of a particular object and therefore ignoring all other aspects or details.
In the question above, the given statement signifies that Professor Brandt is conducting a study on the perceptual sets.
Warring states were defeated, and China was unified: Qin dynasty<span>Confucianism strengthened and spread: Han dynasty
</span><span>Written laws came into effect as a writing system developed: Zhou dynasty
</span><span>Hope this helped.
</span>