Pretty good question you got there
Answer:
A push-approach to inventory
Explanation:
The traditional processing is based on "push-approach" to inventory which is slow and ineffective, on the other hand, Just-in-Time processing eliminates the inventories by using the pull approach.
Just-in-tIme has three needed elements:
1. Dependable suppliers
Who can deliver the required raw materials and other needed items on a short notice and are reliable.
2. Multi-skilled work force
Who can operate a wide range of manufacturing machinery.
3. Total quality control system
To ensure "No defects" in the manufacturing process which required continuous monitoring.
Therefore, In order to have a successful JIT processing system, all of the following must be present EXCEPT: A push-approach to inventory
Answer:
1. Discrimination
2. Stereotype
3. (I'm not sure about this one I'm sorry)
4. Inequities
Explanation:
In 1890, Captain Alfred Thayer Mahan, a lecturer in naval history and the president of the United States Naval War College, published The Influence of Sea Power upon History, 1660–1783, a revolutionary analysis of the importance of naval power as a factor in the rise of the British Empire.
Mahan became the college's president in 1886 and held that post until 1889. In 1890 Mahan published his college lectures as The Influence of Sea Power upon History, 1660–1783. ... Before his death in December 1914, Mahan foretold the defeat of the Central Powers and of the German navy in World War I.
Answer: False
Explanation: There are rules/ codes of conduct guiding every profession in this case, we shall be considering NSPE Code of Ethics I.2.Fundamental Canons: It states that Engineers, in the fulfillment of their professional duties, shall perform services only in areas of their competence.