Answer:
V(t) = 14,000(0.89)^t
Step-by-step explanation:
Present value of the Dodge Challenger = $14,000
Present percentage value = 100%
Depreciation value = 11%
Number of years = t
Future value = V(t)
V(t) = Present value of the Dodge Challenger(Present percentage value - Depreciation value)^t
= 14,000(100% - 11%)^t
= 14,000(89%)^t
= 14,000(0.89)^t
V(t) = 14,000(0.89)^t
Answer:
p(on schedule) ≈ 0.7755
Step-by-step explanation:
A suitable probability calculator can show you this answer.
_____
The z-values corresponding to the build time limits are ...
z = (37.5 -45)/6.75 ≈ -1.1111
z = (54 -45)/6.75 ≈ 1.3333
You can look these up in a suitable CDF table and find the difference between the values you find. That will be about ...
0.90879 -0.13326 = 0.77553
The probability assembly will stay on schedule is about 78%.
What pattern are you talk about
Answer:
They are similar
Step-by-step explanation:
If two triangles are similar, the ratio of their corresponding side lengths must be equal to each other.
This means that for ∆LQP and ∆LMN to be considered similar to each other, therefore:
LM/LQ = LN/LP
LM = 100
LQ = 12
LN = 75
LP = 9
LM/LQ = 100/12 = 25/3
LN/LP = 75/9 = 25/3
LM/LQ = LN/LP = 25/3, therefore ∆LQP and ∆LMN are similar to each other because the ratio of their corresponding side lengths are the same.
supplementary angles = 180 degrees
so x = angle 1
y = angle 2
y = 3x-12
x + 3x-12 =180
4x-12 = 180
4x = 192
x = 192/4 = 48
y = 3(48) -12 = 144-12 = 132
132 +48 = 180
the angle is 132