I think the answer is WAN (wide area network)
Answer:
The expression of this question can be given as:
Expression:
*ip + 1
Explanation:
In this question, it is given that ip variable has been declared and initialized and the ip variable is in the first half of the array. It finds the expression whose value is after the element of the array that ip points. So the expression to this question is *ip + 1. Where * is used to define ip variable as a pointer and its value is increased by 1 that is given in the question.
Hey,
Its a very rare error error in VB installation,
Try installing this:
<span>Jet 4.0 Service Pack 8 (SP8) for Windows XP (KB829558)
</span>I hope this will help.
Answer:
Optimistic duration
Explanation:
The following three concepts are Project management concepts:
Optismitic duration: Estimation of the shortest duration of a task, taking into account the difficulty, etc.
Pessimistic duration: Estamation of the longest duration of a task, taking into account the difficulty, etc
Expected duration: Expected duration of a task, kind of a compromise between the optmistic duration and the pessimistic duration.
Which of the following is the estimate of the minimum amount of time it would take to perform a task?
The answer is Optimistic duration