1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Fynjy0 [20]
3 years ago
8

Which of the following is an example of a complex formula

Computers and Technology
1 answer:
morpeh [17]3 years ago
5 0
I need to know the following 
You might be interested in
A _____ is a network that uses multiple access points to link a series of devices that speak to each other to form a network con
morpeh [17]
I think the answer is WAN (wide area network)
6 0
3 years ago
Assume that ip has been declared to be a pointer to int and that result has been declared to be an array of 100 elements . Assum
Bogdan [553]

Answer:

The expression of this question can be given as:

Expression:

*ip + 1

Explanation:

In this question, it is given that ip variable has been declared and initialized and the ip variable is in the first half of the array. It finds the expression whose value is after the element of the array that ip points. So the expression to this question is *ip + 1. Where * is used to define ip variable as a pointer and its value is increased by 1 that is given in the question.

7 0
3 years ago
How to fix the Run Time ERROR 3706 provider cannot be found in ACCESS 2007?
stiks02 [169]
Hey,
Its a very rare error error in VB installation,
Try installing this:
<span>Jet 4.0 Service Pack 8 (SP8) for Windows XP (KB829558)
</span>I hope this will help.
7 0
3 years ago
Which of the following is the estimate of the minimum amount of time it would take to perform a task? (Points : 2) Minimal durat
kondor19780726 [428]

Answer:

Optimistic duration

Explanation:

The following three concepts are Project management concepts:

Optismitic duration: Estimation of the shortest duration of a task, taking into account the difficulty, etc.

Pessimistic duration: Estamation of the longest duration of a task, taking into account the difficulty, etc

Expected duration: Expected duration of a task, kind of a compromise between the optmistic duration and the pessimistic duration.

Which of the following is the estimate of the minimum amount of time it would take to perform a task?

The answer is Optimistic duration

7 0
3 years ago
The security administrator for Corp wants to provide wireless access for employees as well as guests. Multiple wireless access p
Artemon [7]
It’s B I took the test
7 0
3 years ago
Other questions:
  • 4. The same data source can be used multiple times in creating mail-merge documents.
    7·1 answer
  • How many bits must be “flipped” (i.e., changed from 0 to 1 or from 1 to 0) in order to capitalize a lowercase ‘a’ that’s represe
    11·1 answer
  • __________ was awarded the Nobel Prize in physics forhis work on the photoelectric effect.
    13·1 answer
  • I wonder how world is created
    12·2 answers
  • An Administrator wants to have a thank you email sent after the form on the "Request a Demo" landing page is submitted. Where ca
    12·1 answer
  • Consider the following method:
    14·1 answer
  • What is the value of the variable result after these lines of code are executed?
    11·1 answer
  • What is the function of the NOS? Select all that apply.
    5·2 answers
  • Which components exist in the contextual tab for tables called Design? Check all that apply.
    15·2 answers
  • Which button in the Sort &amp; Filter gallery of the Data tab would alphabetize from A to Z quickly?
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!