Answer:
Total production should be greater or equals to 20 units.
Explanation:
Increasing marginal returns is an improvement in the quantity of goods produced by a company and it typically occurs over the short period of time when the amount of a variable input is initially added to a fixed input.
so given that total production increases when the first and the second workers were hired, therefore total production should be more than 20 units
<span>An upcoming labor shortage that is expected to be temporary can be met and alleviated by using temporary labor solutions shush as offering overtime or other incentives for increased productivity from established workers, hiring from temporary labor pools, or cross training existing workers to be productive in other areas of labor as needed.</span>
<span>This style is known as Aleatoric music. It comes from the Latin word alea which means dice. It is music that has some primary element of the work left to the determination of the performer or performers. It is generally associated with compositions where there are limited numbers of possibilities left to chance.</span>
Answer: Option (B)
Explanation:
In project and production management, bottleneck is referred to as one of the process under chain of processes, so that reduced limited capacity tends to reduce capacity of whole chain. The result or outcome of having the bottleneck is the stalls in supply overstock, production, pressure from consumers and also the low employee morale.
Solution :
1. Predetermined overhead rate
Fixed
(253,000 / 22,000) = $ 11.5
Variable
per direct labor-hour = $ 1
Predetermined overhead rate = $12.5
2. Total job cost $
Direct materials 703
Direct labor cost 317
Applied overhead (8 hours x $12.5 per direct labor hour) = 100
Total job cost = $ 1120
3. Charges = $ 1120 x 140%
= $1568