1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alexeev081 [22]
3 years ago
10

What are the names of the 3 main languages used for making websites

Computers and Technology
1 answer:
Anna35 [415]3 years ago
3 0

Answer:

I believe this is the answer youre looking for

HTML, CSS, and JavaScript.

You might be interested in
Why should you limit what information is in your digital footprint?
oee [108]

Answer:

Your “digital footprint” includes all traces of your online activity, including your comments on news articles, posts on social media, and records of your online purchases. When you know the boundaries of your digital footprint and take steps to contain it, you can help protect your identity and your reputation.

Explanation:

3 0
4 years ago
In cell E14, enter a date function that calculates the number of days between the Initial Deadline (cell E10) and the Date Recei
tatuchka [14]

Answer:

The formula to enter in E14 is as follows:

=DAYS(D14,$E$10)

Explanation:

Required

Formula to calculate the number of days between E10 and D14

The syntax to do this is:

=DAYS(end_date,start_date)

So, we have:

=DAYS(D14,E10)

The question requires a mix of relative and mixed references because cell E10 will be constant in calculating the difference for dates in other cells.

In other words, the initial date is constant for all

So, the update formula is:

=DAYS(D14,$E$10)

Notice the $ between in E10; this represents mixed referencing

When dragged to E15 till E68, the formulas in the respective cells will be:

=DAYS(D15,$E$10) .............................. =DAYS(D68,$E$10)

7 0
3 years ago
Why linked list is better than an array?
katrin [286]
In conclusion there are many different data structures. Each data structure has strengths and weaknesses which affect performance depending on the task. Today, we explored two data structures: arrays and linked lists. Arrays allow random access and require less memory per element (do not need space for pointers) while lacking efficiency for insertion/deletion operations and memory allocation. On the contrary, linked lists are dynamic and have faster insertion/deletion time complexities. However, linked list have a slower search time and pointers require additional memory per element in the list. Figure 10 below summarizes the strength and weakness of arrays and linked lists.
8 0
3 years ago
(iii) If 1 GB = 2x<br>then what is the<br>value of x?​
frez [133]
Since a Gigabyte is made of Megabytes, 500 Megabytes times 2, 2(500MB), is equal to one Gigabyte. (1000MB)
UNLESS, it wants the Windows way of storage, because one Gigabyte in Windows terms is actually 1024 megabytes... then it’d be 2(512MB) because 512MB and 512MB equals one windows storage gigabyte.
4 0
3 years ago
Write a program that would determine the day number in a non-leap year. For example, in a non-leap year, the day number for Dec
SOVA2 [1]

Answer:

In Python:

months = ["Jan","Feb","Mar","Apr","May","Jun","Jul","Aug","Sep","Oct","Nov","Dec"]

daymonths = [31,28,31,30,31,30,31,31,30,31,30,31]

day = int(input("Day: "))

month = input("Month: ")

ind = months.index(month)

   

numday = 0

for i in range(ind):

   numday+=daymonths[i]

numday+=day

print(numday)    

Explanation:

This initializes the months to a list

months = ["Jan","Feb","Mar","Apr","May","Jun","Jul","Aug","Sep","Oct","Nov","Dec"]

This initializes the corresponding days of each month to a list

daymonths = [31,28,31,30,31,30,31,31,30,31,30,31]

This gets the day from the user

day = int(input("Day: "))

This gets the month from the user

month = input("Month: ")

This gets the index of the month entered by the user

ind = months.index(month)

This initializes the sum of days to 0

numday = 0

This adds up the days of the months before the month entered by the user

<em>for i in range(ind):</em>

<em>    numday+=daymonths[i]</em>

This adds the day number to the sum of the months

numday+=day

This prints  the required number of days

print(numday)    

<em>Note that: Error checking is not done in this program</em>

7 0
3 years ago
Other questions:
  • 1. Which of the following are considered CAD powerhouses?
    6·1 answer
  • DSL technology is less efficient for service providers in the United States because many of their customers live in less-densely
    11·1 answer
  • A resistor bank is connected to a controller with conductor insulation rated 75 °C. The resistors are not used in conjunction wi
    15·1 answer
  • What is included on the HP PC Hardware Diagnostics 3-in-1 USB Key that allows you to recover systems that cannot boot?
    14·1 answer
  • In vehicles equipped with ABS, the driver's foot must remain firmly on the _________ to activate the ABS.
    7·2 answers
  • The image below shows an encoding for a black and white pixel image. The first two
    13·1 answer
  • What are some best practices for file management
    8·1 answer
  • 6
    9·1 answer
  • You're making great progress on your assignment. You've defined the purpose of your message, identified both the primary and sec
    9·1 answer
  • What is the descriptor for a filter that warns or blocks you from potentially fraudulent or suspicious websites?.
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!