<span>Rate of pump A: 1/8 of a pool per hour
Rate of pump B: 1/9 of a pool per hour
Combined rate: 1/8+1/9 = 17/72 +1/9 = 25/72
So if they work together, the two pumps have a combined rate of 25/72 of a pool per hour (i.e in one hour, the two pumps will empty 25/72 of the pool)
</span><span>But we want to empty ONE pool (not 25/72 of one). So we need to multiply 25/72 by some number x to get 1.
</span>
<span>Now solve for x
x=2.88
</span><span>It will take the two pumps 2.88 hours to empty the pool.
2 hours 52 minutes 50 seconds</span>
10, 10, 20 or either of u talking abt about tah the whole either 0-100
Answer:
3
Step-by-step explanation:
the line crosses the y-axis at (0,3)
Part 1
1. 16-composite
2. 0- Neither
3. 29- prime
4. 33- composite
5. 47- prime
6. 51- composite
7. 64- Composite
8. 73- prime
9. 12- Composite
10. 24- Composite
11. 17- prime
12. 38- composite
Answer:i THINK 79, i dont know fully, but i think 79