Answer: ICT help banks improve the efficiency and effectiveness of services offered to customers, and enhances business processes, managerial decision making, and workgroup collaborations, which strengthens their competitive positions in rapidly changing and emerging economies.
Explanation: please give branliest I only need one more to make ace
This question is a bit ambiguous as there were a few features that were added and any could be perceived as distinguishing depending on what you look for in your OS. I do believe this is in reference to the Wikipedia article on Windows 2.0 though as the first two listed features make note of Windows 1.0 specifically, therefore:
Windows 2.0 allowed windows to overlap, Windows 1.0 could not do this.
Windows 2.0 introduced new and more complex keyboard shortcuts and terminology such as "Minimize" and "Maximize" vs. Window 1.0's "Iconize" and "Zoom"
Source: https://en.m.wikipedia.org/wiki/Windows_2.0
A database is used to organize a large collection of data, hence the name database. It is literally a base that would contain a chunk of data that a person or an organization will need to pull out later when they need it. Databases are usually used by companies or organizations
Answer: four different types
There are four different types of IPv4 addresses: public, private, static, and dynamic. While the public and private are indicative of the location of the network—private being used inside a network while the public is used outside of a network—static and dynamic indicate permanency.
Answer:
See explanation below
Explanation:
Previos concepts
First Come First Serve (FCFS) "is an operating system scheduling algorithm that automatically executes queued requests and processes in order of their arrival".
Shortest job next (SJN), or the shortest job first (SJF) or shortest "is a scheduling policy that selects for execution the waiting process with the smallest execution time".
Shortest remaining time (SRF) "is a scheduling method that is a preemptive version of shortest job next scheduling'".
Round robin (RR) is an algorithm where the time parts "are assigned to each process in equal portions and in circular order, handling all processes without priority"
Solution for the problem
Assuming the dataset given on the plot attached.
Part a
For this algorithm the result would be:
Job A 0-6
Job B 6-(6+3) = 6-9
Job C 9-(9+1) = 9-10
Job D 10-(10+4) = 10-14
Part b
For this algorithm the result would be:
Job A 0-6
Job C 6-(6+1) = 6-7
Job B 7-(7+3) = 7-10
Job D 10-(10+4) = 10-14
Part c
For this algorithm the result would be:
Job A 0-1 until 14
Job B 2-(2+3) = 2-5
Job C 3-(3+2) = 3-5
Job D 9-(9+5) = 9-14
Part d
For this algorithm the result would be:
Job A 0-2 , 7-9, 12-14
Job B 2-4, 9-10
Job C 4-(4+1) = 4-5
Job D 5-7, 10-12