Answer: m= -2
b= 14
y= -2x+14
Step-by-step explanation:
First, you estimate to find the m. After you get -2, you plug the numbers in, and see what you add to get x.
Answer:
what is the question need more decription
Answer:
Step-by-step explanation:x+y+z=100(let x ,y,z represent the first second and third numbers respectively)
Therefore,y=2z
z=x-8
y=2x-16
substituting the values of x,y and z into the question,we have
x+(2x-16)+(x-8)=100
Simplifying,we have
4x-24=100
adding 24 to both sides of the equation,
4x=100+24
4x=124
dividing both sides of the equation by the co-efficient of x,we have
4x/4=124/4
4.31=124
therefore,x=31.
Total cost for tiles and paints is $924.
Step-by-step explanation:
We have been given that a community hall is in the shape of a cuboid. The hall is 40m long 15m high and 3m wide.
The paint will be required for 4 walls and ceiling.
Let us find area of walls and ceiling.
Therefore, the area of walls and ceiling is 1410 square meters.
Given: Cost for 10 litre of paint is $10 and 10 litre paint covers 25 square meter. Therefore,
Therefore, the total painting cost is $564.
Tiles will be required for floor. Let us find the area of floor.
Given: 1m squared floor tiles costs $3. So,
Therefore, the total cost for tiles is $360.
Now let us find combined total cost of tiles and paint.
Therefore, the combined total cost of tiles and paint is $924.
I’m really late this time I’m sure you are alr done with your I ready lol