it most likely is the first one cause distribution is when the film is sold, development is basically like the process and how it's going, production is during the creation of the film so pre-production is my best guess
Answer:
C. an illuminated manuscript
I’m 99.5% sure it’s false
Answer:
The drawings you're referring are the ones related to the construction details, which are used to determine the dimensions or any other technical specification that the architect or the engineer wanted to be added to the construction.
Explanation:
These drawings following rigid and strict rules to be executed. They must show in detail the geometric form of a part of an object such as a building, bridge, tunnel, machine, plant, and so on. They tend to be large-scale drawings that show in detail parts that may be included in less detail on general arrangement drawings.