Answer:
5
Step-by-step explanation:
use the distributive property
6 * 1/2 = 3
6 * 1/3 = 2
3 + 2 = 5
<em><u>Hope this helped! Have a nice rest of ur day! Plz mark as brainliest!!!</u></em>
<em><u>-Lil G</u></em>
Answer:
Option D is the correct answer - Estimation is best defined as a process of inferring the values of unknown samples statistics from those of known population parameters
Step-by-step explanation:
Estimation involves the usage of the value of a statistic derived from a sample to estimate the value of a corresponding population parameter.
The sample provides information that can be extended, through several formal or informal processes, to determine a range most suitable to describe the missing information.
An estimate that turns out to be incorrect would either be termed as over-estimation or under-estimation. If the estimate exceeds the actual result, it is termed as an over-estimation, and as an under-estimation, if the estimate came short of the actual result.
Thus, option D is correct.
The grade of the path in the mountain is calculated by determining first the ratio between the rise over the run and multiplying the ratio by 100%.
For Path A:
grade = (rise / run) x 100%
grade = (1414/ 3535) x 100% = 40%
<em>Answer: 40%</em>
For Path B:
grade = (rise / run) x 100%
grade = (4.26 m/ 22 m) x 100% = 19.36%
Answer: 19.36%