First we will calculate rate of work of rosa and amy.
work done by rosa in time t=t*1/7
Work done by Amy and rosa=t(1/7+1/4.2)
t/7+t/a=t/4.2
t=10.5 hr
Always keep remember those formula or logic belowWork rate × Time to finish the job = 1 job done
Work rate = (1 job done) / (Time to finish the job)
Time of doing the job = (1 job done) / (Work rate)
Answer:DC=7
Step-by-step explanation:
As it is written △ABC = △DBC. So the corresonding legs (the legs which are equal ) are as follows:
AC=DC AB=DB BC= BC
So DC=7 the same like AC
<span>A rectangle has a length the area of the rectangle is 180(2w-9=180).Find the length and the width of the rectangle. Find the perimeter of the rectangle</span>