1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Inessa [10]
4 years ago
8

I will mark brainlist and 20 extra points

Mathematics
2 answers:
grandymaker [24]4 years ago
5 0
(X1=1, y1=7) and (x2= -4, y2 =-8)

Slope = ( y2-y1)/(x2-x1)= (-8-7)/(-4-1)= -15/-5=3

Slope is 3
KatRina [158]4 years ago
4 0
Hello  <span>Loading000


Answer: 3


Hope this helps
-Chris</span>
You might be interested in
Y+5=x+3 in standard form
podryga [215]

Answer: x-y=2

Step-by-step explanation:

y+5=x+3; move variable (x) to the left-hand side and change the sign.

y-x+5=3; move the constant to the right-hand side & change the sign

y+x=3-5; reorder the terms

-x+y=3-5; calculate

-x+y=-2; change the signs on both sides

x-y=2 is your answer! hope this helps!

7 0
3 years ago
If a cross section of a paperweight is cut to the base but does not pass through the vertex which shape descrives the cross sect
hodyreva [135]
That depends on the shape of the paperweight.
5 0
4 years ago
How many megabytes of data can a 4.7 gigabyte dvd store?
dedylja [7]
The answer is 4700 megabytes.

1 giga = 1000 mega

1 gigabyte = 1000 megabyte
4.7 gigabyte = x megabyte

1 gb : 1000 mb = 4.7 gb : x
x = 1000 mb * 4.7 gb : 1 gb
x = 4700 mb 
3 0
3 years ago
The altitude to the hypotenuse of a right triangle divides the hypotenuse into segments of lengths 64 and 4. What is the length
Brilliant_brown [7]
Here, Ratio of corresponding length would be equal.
Let, Altitude = x
Then, 64 / x = x / 4
x² = 256
x = √256
x = 16

In short, Your Answer would be 16 units

Hope this helps!
8 0
4 years ago
I started walking at 4pm when I finished the hour hand of the clock turned 90 degrees what time did I finish
Ulleksa [173]

Answer:

7 P.M.

Step-by-step explanation:

Time at which the walk was begun = 4 p.m.

Finished after rotating the clock 90° i.e. = 3 hours

Thus,

The time at which the task finished = 4 p.m. + 3hours

= 7:00 PM

5 0
3 years ago
Other questions:
  • What is the value of z in the equation 2(4z – 9 – 11) = 166 – 46?
    15·2 answers
  • Write the equation of the line that is parallel to line c and passes through (3,-4).
    11·1 answer
  • What is the value of x for the given equation? 4 – 2(x + 7) = 3(x + 5)
    5·2 answers
  • Solve the equation and show your work and combine like terms first
    13·1 answer
  • Two children share 2 ½ chocolate bars with each child getting the same amount. how much does each child get?
    13·1 answer
  • Equivalent fractions
    6·2 answers
  • Lines AB and CD are straight lines. Find x and y. Give reasons to justify your solutions.
    7·1 answer
  • Ramon paid $3.25 for notepads and $1.80 for markers. what is the total number of items he bought?
    12·2 answers
  • Can yall help me please thanks you.<br><br>​
    10·2 answers
  • Consider the right triangle below. A right triangle with a hypotenuse with length 6.5 feet, and side lengths of 2.5 feet and 6 f
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!