Answer:
d. 0.0948 ± 4.032(0.0279)
Step-by-step explanation:
A 99% confidence interval for the coefficient of promotional expenditures is, First, compute the t critical value then find confidence interval.
The t critical value for the 99% confidence interval is,
The sample size is small and two-tailed test. Look in the column headed es = 0.01 and the row headed in the t distribution table by using degree of freedom is here
for (n-2=5) degree of freedom and 99% confidence ; critical t =4.032
therefore 99% confidence interval for the slope =estimated slope -/+ t*Std error
= 0.094781123 -/+ 4.032* 0.027926367 = -0.017822 to 0.207384
These numbers from least to greatest would be: 4.72, 4.74, 4.98
Answer: No, because P(F T) = P(F) • P(T)
Step-by-step explanation:
Answer:
area: 72 perimeter: 36
Step-by-step explanation:
area of big rectangle, 10x6=60
height of triangle:4 multiplied by 3 (6/2=3) =12 12+60=72
length of sides added together: 10+10+6+5+5=36
Answer:
12 inches
Step-by-step explanation:
180 divided by 3 = 6
so the tower is now divided into 6 pieces
each piece is 30 feet
every 30 feet is represented by 2 inches
2 times 6 = 12