Answer:
The average acceleration of train is 
Step-by-step explanation:
We have,
A train that slows down from 15 m/s to 8.6 m/s in 1.2 s. It means that 15 m/s is its initial velocity and 8.6 m/s is its final velocity.
It is required to find the average acceleration of the train.

The average acceleration of train is
. Negative signs shows that the train is decelerating.
27.795......................................................
Answer:
b
Step-by-step explanation:
Answer:
Cost to construct the road = 775000 rupees
Step-by-step explanation:
Square field has a side = 150 m
Area of the field = (Side)²
= (150)²
= 22500 m²
Length of the park with road around the field = 150 + 2×(width of the road)
= 150 + (2×5)
= 160 m
Similarly, width of the park with road around the field = 160 m
Area of the park with road = (Side)²
= (160)²
= 25600 m²
Area of road = Area of the park with road - Area of the park
= 25600 - 22500
= 3100 m²
Since, cost of constructing the road = 250 rupees per square meter
Cost to construct the road with the given area = 250 × 3100
= 775000 rupees
Answer:
Step-by-step explanation: