1.68 mm per year for 1.5 years could be rewritten as
(2.00-0.32) mm per year for 1.5 yrs.
Multiply: (1.5 yrs)(2.00-0.32)(mm/yr) = 3 mm + 0.48 mm = 3.48 mm
This approach makes use of the distributive property of multiplication.
The probability of event A and event B IS 15/91.
What is the probability?
Probability determines the odds that a random event would occur. The odds lie between 0 and 1.
The probability of event A = number of brown marbles / total number of marbles
= 6/14
The probability of event B = number of orange marbles / total number of marbles -1
= 5/13
P(A and B) =6/14 x 5/13
= 30/182
= 15/91
To know more about probability visit:
brainly.com/question/3142525
#SPJ4
Answer:
y=3x-2
Step-by-step explanation:
Because the equation for slope intercept form is y=mx+b!
Answer:
(A) 5.47 km
(B) 1.38 km
Step-by-step explanation:
The relationship between Pressure (mmHg) and Height (km) is given by the equation below:
p =760 e⁻ 0.145h----------------------------------------------------- (1)
(a) The height of the aircraft can be calculated by making 'h' the subject of equation (1)
In (p/760) = -0.145 h
h = -In (p/760) /0.145
h= In (760/p)/ 0.145------------------------------------------------- (2)
For the aircraft, p =344 mmHg; substituting into (2)
h = In (760/344)/0.145
= 0.7926/0.145
= 5.4662 km
≈ 5.47 km
(b) p= 622 mmHg at the mountain top. Substituting into equation (2) we have:
h = In (760/622)/0.145
= 0.2003 / 0.145
= 1.3813 km
≈ 1.38 km
Answer:
110%
Step-by-step explanation:
1 2/20=22/20 which = 110%