1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Allushta [10]
3 years ago
5

How do you work this problem? 5 4/10 + 3 6/9

Mathematics
1 answer:
oee [108]3 years ago
3 0

Answer:

136/15

Step-by-step explanation:

5 4/10+3 6/9

=54/10+33/9

=9*54+10*33/90

=486+330/90

=816/90

=136/15

You might be interested in
An HR director numbered employees 1 through 50 for an extra vacation day contest. What is the probability that the HR director w
forsale [732]

Answer:

The probability that the HR director will select an employee who is not a multiple of 13 is \frac{47}{50}

Step-by-step explanation:

* <em>Lets explain how to solve the problem</em>

- The probability of an event is the measure of the chance that the

  event will occur

- The probability of an event A is the number of ways that event A can

 occur divided by the total number of possible outcomes

- If P(A) is the probability of event A,  is the probability that the event A

 does not occur is 1 - P(A)

* <em>Lets solve the problem</em>

- An HR director numbered employees 1 through 50 for an extra

 vacation day contest

∴ There are 50 employees

- The HR director will select an employee

- We need to find the probability of select an employees who is not

 multiple of 13

* At first lets find the multiples of 13

∵ 13 × 1 = 13

∵ 13 × 2 = 26

∵ 13 × 3 = 39

∴ The multiples of 13 from 1 to 50 are 13 , 26 , 39

∵ There are 3 multiples of 13

∵ There are 50 numbers

∵ Probability of multiple of 13 = \frac{3}{50}

∵ Probability of not multiple of 13 = 1 - P(multiple of 13)

∴ Probability of not multiple of 13 = 1-\frac{3}{50}

∴ Probability of not multiple of 13 = \frac{47}{50}

* The probability that the HR director will select an employee who is

  not a multiple of 13 is \frac{47}{50}

4 0
3 years ago
1
Nina [5.8K]
B, is the correct answer
4 0
3 years ago
Suppose a certain manufacturing company produces connecting rods for 4- and 6-cylinder automobile engines using the same product
gregori [183]

Answer:

Generally the constraint that sets next week are shown below

Generally the constrain that sets next week maximum production of connecting rod for 4 cylinder  to  W_4 or  0 is  

     x_4 \le W_4 *  s_4

    x_4 \le 5000 *  s_4

Generally the constrain that sets next week maximum production of connecting rod for 6 cylinder  to  W_6 or  0  is  

     x_6 \le W_6 *  s_6

     x_6 \le 8,000 *  s_6

Generally the constrain that limits the production of connecting rods  for both 4 cylinder and 6 cylinders  is

     x_4 \le W_4 *  s_6

=>   x_4 \le 5000 *  s_6

     x_4 \le W_6 *  s_4

=>    x_4 \le 8000 *  s_4

     s_4 + s_6 = 1

The minimum cost of production for next week is  

   U  =  M_4 *  x_4 + M_6 * x_6 + C_4 * s_4 + C_6 * s_6

=>  U  =  13x_4 + 16x_6 + 2000 s_4 + 3500 s_6

Step-by-step explanation:

The cost for the four cylinder production line is  C_4 =  \$2,100

The cost for the six cylinder production line is  C_6 = \$3,500

The manufacturing cost for each four cylinder is  M_4= \$13

 The manufacturing cost for each six cylinder is M_6= \$16

  The weekly production capacity for 4 cylinder connecting rod is W_4 = 5,000

   The weekly production capacity for 6 cylinder connecting rod is W_6 = 8,000

Generally the constraint that sets next week are shown below

Generally the constrain that sets next week maximum production of connecting rod for 4 cylinder  to  W_4 or  0 is  

     x_4 \le W_4 *  s_4

    x_4 \le 5000 *  s_4

Generally the constrain that sets next week maximum production of connecting rod for 6 cylinder  to  W_6 or  0  is  

     x_6 \le W_6 *  s_6

     x_6 \le 8,000 *  s_6

Generally the constrain that limits the production of connecting rods  for both 4 cylinder and 6 cylinders  is

     x_4 \le W_4 *  s_6

=>   x_4 \le 5000 *  s_6

     x_4 \le W_6 *  s_4

=>    x_4 \le 8000 *  s_4

     s_4 + s_6 = 1

The minimum cost of production for next week is  

   U  =  M_4 *  x_4 + M_6 * x_6 + C_4 * s_4 + C_6 * s_6

=>  U  =  13x_4 + 16x_6 + 2000 s_4 + 3500 s_6

3 0
3 years ago
What are the solutions to the equation x-7/x=6?
Vilka [71]

Answer:

x=7

7-7/7-6=0

0/1=0

Zero divided by anything=0

7 0
1 year ago
What is the square root of 16
musickatia [10]
The square root of 16 is 4 you do 4x4=16

3 0
3 years ago
Other questions:
  • Researchers at a pharmaceutical company have found that the effective time duration of a safe dosage of pain relief drug is norm
    6·1 answer
  • 3 - 2 tenths. what's the answer?
    12·1 answer
  • There are 40 houses in a neighborhood • company X provides electricity to 1/5 of the houses • company Y provides electricity to
    10·2 answers
  • What is 30 rounding to the nearest ten
    8·2 answers
  • Tiara earned 12 dollars on her
    9·1 answer
  • In an experiment you are to flip a two sided coin 100 times and record 55 heads up and 45 tails up. Determine the theoretical an
    14·2 answers
  • Which of the sequences is an arithmetic sequence?
    12·1 answer
  • WHAT IS 10 x 12 - 14 DIVIDED BY 2 + 15 (USING PEMDAS , GEMDAS)
    11·2 answers
  • F(x)=2x^2-5;find when f(x)=-7​
    6·2 answers
  • can someone explain the proses of solving this? I don't need the answer but a step-by-step explanation would be super helpful!
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!