The limit it converges to is 0
Answer:
-2
Step-by-step explanation:
The slope of a line is given by
m = (y2-y1)/(x2-x1)
= (-3 -5)/(2- -2)
= -8/(2+2)
-8/4
-2
so 5 people work each one for 21 minutes, that means 21+21+21+21+21 minutes altogether, namely 105 minutes, it took that long for 7 walls, hmmmm how long for just one wall then? well, 105 ÷ 7, namely 15 minutes then, for just 1 wall.
now, if it takes 15 minutes of work to do one wall, what about 5 walls? well, that'd be 15*5 or 75 minutes.
so if we have 3 folks working, how much would each one work? well, 75 ÷ 3, namely 25 minutes, so each of them will work 25 minutes, namely 25+25+25 minutes, so in 25 minutes, they'll be done with 5 walls.
It is 1/6 or .16 I used Photomath
Using tan50=p/14=p=14*tan50
total distance betn the end of the class = 28*tan50=53.6910052ft