Answer:
Glass
Explanation:
Please mark me the brilliant
The rainfall run off model HEC-HMS is combined with river routing model. They are used for simulating the rainfall process.
Explanation:
The HEC - HMS rainfall model is used for simulating the rainfall runoff process. In this study the soil conservation service and curve number method is used to calculate the sub basin loss in basin module.
It provides various options for providing the rainfall distributions in the basin. It has the control specification module used to control the time interval for the simulations.
The one dimensional continuity equation is
бA / бT + бQ / бx= 0
Answer:
Integrated development spends more money up front to order to save money in later stages.
Explanation:
The primary difference between integrated/concurrent engineering development and functional/sequential development is: Integrated development spends more money up front to order to save money in later stages.
Cost of integrated development is higher in the initial stages where setup has be made and proper training and education of employees are required and once it is done. It will save money in later stages.
we can see that the correct person here will be Technician B who says that a diesel engine is designed to operate at near or maximum speed for long periods without damage.
<h3>What is a diesel engine?</h3>
A diesel engine is actually known to be an engine that makes use of diesel as its fuel. In other words, diesel engines run on diesel.
We see here that a diesel engine is actually designed to work for a very time on near or maximum speed without damage. This is true because the diesel fuel has that strength.
Also, diesel engines may be designed as two or four stroke cycles.
Learn more about diesel engine on brainly.com/question/13146091
#SPJ1