Answer:
1000x
Step-by-step explanation:
Answer:
(-2+-5) equals -7.
Because the signs are the same, we dont change it.
(3+5) equals 8. Same like the other equation, the signs are the same so we do not change it.
Now we do (-7+8) The answer will be 1. Lets use a little graph since its hard to explain.
-8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8
Mark -7 anyway you want. (Circle it, draw a line under it, what ever you want.)
Now Move the line 8 times.
When you do that your line will stop at 1.
And thats how you do it.
Step-by-step explanation:
2 1/4 miles => 1 week
1 mile => 1 ÷ 9/4
( 9/4 is an improper fraction of 2 1/4 )
12 1/2 miles => ( 1 ÷ 9/4 ) × 25/2
= 50/9
= 5 5/9 weeks
( 25/2 is an improper fraction of 12 1/2 )
Therefore, it will take 5 5/9 weeks for the company to replace the stretch of road.
( you can round it off to 6 weeks if the qn specify to give to the nearest whole number )
The answer is 77 but i don't see it as an option here ;/