1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
dolphi86 [110]
3 years ago
9

About ________ percentage of the American adult population identifies with the Protestant, Catholic, or Jewish faiths?

Social Studies
1 answer:
NARA [144]3 years ago
3 0

Answer:

The correct answer for the blank space is: 77.

Explanation:

A study conducted between January 2 and November 30, 2012, and based on more than 326,000 tracking interviews, showed that about 77 percent of American adult population identified with the Protestant, Catholic, or Jewish faiths.

You might be interested in
Some well-known message problems have occurred when u.s. companies have taken their messages to cultures with different ________
ss7ja [257]
Dialects/ languages
3 0
3 years ago
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
Please give me the awnser
Bas_tet [7]

Answer:

Energy or food

Explanation:

Figure it out your a big boy now I'm a 32 year old teacher from your school named ms Shelley I'm going to be contacting your mother about this using electronics on school property.

8 0
3 years ago
Plz answer this ASAP
natima [27]

Answer:

Ok first one ok so sometimes people don't like a certain religion and which they speak out and criticize there religion and it can end up with some people not being happy number 2 some people actually like all religions and they like it for a reason and some people disagree with them but a religion is a religion and they can't change the way they think.

5 0
3 years ago
Name some of the legal restraints on police action, and list some types of behavior that might be considered abuse of police aut
Masja [62]
Probable cause. An officer has reason to believe that a crime may be comitted. (physical evidence, observations, statements, video/audio.)

Searches. Officers are only allowed to do a pat down (terry search, frisk) as a protective measure. They can do a full search if a suspect is taken into custody.

4th amendment protects against unreasonable search and seizures.  

When a suspect is being questioned (for incriminating information) they must be read their Miranda rights before proceeding. Basic questions are allowed. ("How are you doing?").

Abuse of police authority could be requesting to see an ID when there is no probable cause. 


5 0
3 years ago
Other questions:
  • This case originated to address segregation and discrimination in the railroads of what state? Alabama Louisiana North Carolina
    5·1 answer
  • What year did no taxation without representation start?
    8·2 answers
  • Millennials who are skeptical of their fellow citizens but not of government participate through _____.
    13·1 answer
  • How did some southerners contribute to industrial growth in the region
    11·1 answer
  • In a study (Eberhardt, Davies, Purdie-Vaughns, & Johnson, 2006), participants rated stereotypical "Black
    12·1 answer
  • What does rationalising factor mean? Please provide an example.
    13·1 answer
  • Need Help ASAP!! THANK YOU
    14·1 answer
  • A written code of laws and rights issued by the government is called a
    12·2 answers
  • Some American colonists believed they were justified in declaring independence from Great
    11·1 answer
  • ________ retailers in the united states are growing faster than product retailers.
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!