Answer:
The correct option for a case where is required "brand or equal" is the following:
Option A) "Shifts responsibility for establishing equality or superiority to the bidder"
Explanation:
When a "brand or equal" is required by the specifiers, they are putting the responsibility on the bidder side to find an equal or superior specifications item as required. They must provide enough evidence to the offeror that they are finding the right item or brand as required.
Answer:
Star Wars
Explanation:
In March of 1983, in the USA, President Ronald Reagan announced with an eloquent speech his Strategic Defense Initiative, which was immediately stigmatized by the American press with the nickname "Star Wars.". Reagan asked the American scientific community to develop a missile defense that would guarantee the defense of the US territory against any nuclear attack.
Answer:
I think they are like hiding the real word but saying the same meaning in a hidden way