1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
kati45 [8]
3 years ago
10

If you bought a set of markers for $2.85 and paid for it with a 5 dollar bill, how much change would you receive?​

Mathematics
2 answers:
miss Akunina [59]3 years ago
4 0
3.15 dollar you gonna get back
Mazyrski [523]3 years ago
4 0

Answer:

You would get 2.15$ back.

Step-by-step explanation:

5$-2.85$=2.15$ left over from the original 5$

You might be interested in
In the given figure, BAC = 90° and ABC = 45°. Prove that: AB = AC. ​
Amiraneli [1.4K]

Answer:

<h2>By angle sum property:</h2>

BAC+ABC+BCA=180°

90°+45°+x=180°

135°+x=180°

x=45°=BCA

<h2>since BCA=ABC=<u> </u>45° each </h2><h2>therefore,</h2>

AB=AC \\ (isosceles \: triangle \:  \\ theorem)

<h2><em><u>Hope </u></em><em><u>it </u></em><em><u>helps</u></em><em><u> you</u></em><em><u><</u></em><em><u>3</u></em></h2>
6 0
2 years ago
How the heck do you do this?!
Dennis_Churaev [7]
Use PEMDAS to figure out the order of operations:

Parentheses
Exponents
Multiplication/Division
Addition/Subtraction

Solve (-4 + -6) first, as this is in parentheses:

-4 + -6 = -10

10 - 5.3 * -10

Solve 5.3 * -10 next, as this is multiplication:

5.3 * -10 = -53

10 - -53

Now we can solve the equation:

10 - -53 = 63

The answer is 63.
7 0
3 years ago
Read 2 more answers
Solve the following equation. Then place the correct number in the box provided.
Greeley [361]

3x+1=2x+12

3x-2x=12-1

x=11

6 0
3 years ago
Read 2 more answers
A construction company completes two projects. The first project has $3,000 in labor expenses for 60 hours worked, while the sec
d1i1m1o1n [39]

Answer: 2,100 = 0.02(42) + b

2,100 = 50(42) + b

Step-by-step explanation: good day man

3 0
2 years ago
Because of hiring a plumber, y, to work x hours on a repair project can be modeled using a linear function. the plumber charges
seraphim [82]

Answer:

The plumbers cost would be equal to the equation 80+45x=y with y being the total amount of money he made and x being how many hours he worked.

Step-by-step explanation:

In this equation to find the amount the plumber was paid all you need to do is plug in the amount of hours he worked for x.

If the plumber worked his maximum of 8 hours then the equation would change from 80+45x=y to 80+(45×8)=440.

So, if the plumber worked for 8 hours he would make $440.

4 0
3 years ago
Other questions:
  • Solve the equation: <br><br> 34=2m-8<br><br> (Show your work)
    10·1 answer
  • Judy, Celia, and Betty are a math teacher, a truck driver, and a housewife, but not necessarily in that
    6·2 answers
  • Suzanne can type 24 words in one minute. How many words can she type in 5.5 minutes
    5·2 answers
  • Point E has a negative x-coordinate, and its y-coordinate is not 0. Where could point E be located on the coordinate plane? Choo
    14·2 answers
  • Which statement describes the first step to solve the equation by completing the square?
    10·1 answer
  • Please help.<br> 2) Find the measure of 2q in the figure.
    7·2 answers
  • 3. In a group of students of them are Science Club members and the rest are Mathematic
    6·1 answer
  • I have 3 employees who can make 360 pizzas in 8 hours. 2 employees worked 8 hours but 1 employee only worked 4 hours. How many p
    9·1 answer
  • HELP FAST PLEASE <br> Which table represents y as a function of x?
    9·1 answer
  • What is 92÷30 has an mixed number
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!