1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
butalik [34]
2 years ago
7

Assuming that we only support BEQ and ADD instructions, discuss how changes in the given latency of this resource affect the cyc

le time of the processor. Assume that the latencies of other resources do not change?
Computers and Technology
1 answer:
sertanlavr [38]2 years ago
6 0

Answer:

Refer below.

Explanation:

Because we are inserting commands to beq, we will need an execution of the ALU, and then a register write. This result in and increase cycle time of the PC relative branch:

440+90=530ps.

As it is the longest time to execute, so its a critical path

You might be interested in
How to write the algorithm to calculate the square of five numbers
ioda

Answer:

1. A = 7 and B = 12 here...

2. A^2 = 49 thus final answer will have 9 at units place and 4 is carried to add later.

3. Given number multiplied by 'B' => 127*12 = 1524

4. A*B => 12*7 = 84

5. 1524+84 = 1608 ..... ( step 3 + step 4 )

6. 1608+4 =1612 .... (4 is carried as stated in step 2)

7. Now, 16129 is the answer... (From step 2 and 6)

Explanation:

Divide the number in two parts with one part containing only the number at unit's place say part 'A', and other part say 'B', containing the remaining number.

Now square the number at unit's place. The square will be one of these; {0,1,4,9,16,25,36,49,64,81}. The unit's place digit in this square is the unit's place digit in actual final answer.Write it in the answer. If the square of digit at unit's place is a two digit no like from 16 to 81 in above set; write only the digit at unit's place from this square in the final answer and carry the remaining digit.

Multiply the actual number to be squared by part 'B'(the remaining part than the number at unit's place as described in step 1 ).

Multiply the parts 'A' and 'B'.

Add results of step 3 with results of step 4.

Add the carried digit from step 2 to the sum in prior step, that is step 5.

Now write this sum before the number we wrote at unit's place of final answer in step 2.

This number we now obtain from step 7, is the square of our number.

6 0
2 years ago
Read 2 more answers
What do you mean by data sequencing​
Shalnov [3]

Answer:

Data sequencing is the sorting of data for inclusion in a report or for display on a computer screen.

Explanation:

8 0
2 years ago
Explain each kind of pointer and for what it is appropriate
ycow [4]

Answer:

Explanation:

A pointer is nothing but a memory location where data is stored. A pointer is used to access the memory location. There are various types of pointers such as a null pointer, wild pointer, void pointer and other types of pointers. ... When you want to deal different variable data type, you can use a typecast void pointer.

8 0
3 years ago
Read 2 more answers
10 computer and operating systems errors​
babunello [35]

Answer:

what is

Explanation:

3 0
2 years ago
Read 2 more answers
HELP PLEASE!!!! Which development method is best explained in this way: developing a system through repeated cycles and smaller
vlada-n [284]

Answer:

Incremental method.

Explanation:

Software development life cycle (SDLC) can be defined as a strategic process or methodology that defines the key steps or stages for creating and implementing high quality software applications.

An incremental model refers to the process in which the requirements or criteria of the software development is divided into many standalone modules until the program is completed.

Hence, an incremental method typically involves developing a system through repeated cycles and smaller portions at a time, enhancing and evolving the system over time.

In SDLC, a waterfall model can be defined as a process which involves sequentially breaking the software development into linear phases. Thus, the development phase takes a downward flow like a waterfall and as such each phase must be completed before starting another without any overlap in the process.

Also, a spiral model can be defined as an evolutionary SDLC that is risk-driven in nature and typically comprises of both an iterative and a waterfall model. Spiral model of SDLC consist of these phases; planning, risk analysis, engineering and evaluation.

8 0
2 years ago
Other questions:
  • Interest rate risks would be most relevant to what purchase?
    7·2 answers
  • What do you call a named collection of data stored on a disk?
    15·1 answer
  • Can you plug a usb 2.0 into a 3.0 port on your computer
    12·1 answer
  • Storing a value in a variable<br> Exponent<br> Variable<br> Assignment<br> Operator
    13·1 answer
  • What are informational sessions?
    10·1 answer
  • Which is an example of static web page??
    9·2 answers
  • What is not a common purpose for a research report?
    5·2 answers
  • Describe three perimeter intrusion detection systems and give an example of one that you have seen deployed either at work or an
    8·1 answer
  • Match each example to the type of component, either Input, Process, or Output.
    12·1 answer
  • Physical Geography of the Middle East
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!