The stage that precedes the implementation stage of SDLC is <u>testing</u> and it involves checking the functionality of the system.
System design involves the process of determining an overall system architecture, which typically comprises the following:
- Physical processing components.
Generally, there are seven (7) main stages in the systems development life cycle (SDLC) model and these include:
1. Planning.
2. Analysis.
3. Design.
4. Development.
5. Testing.
6. Implementation.
7. Maintenance.
From the above, we can deduce that the stage which precedes the implementation stage of SDLC is testing.
During the testing stage of SDLC, a quality assurance (QA) expert checks the system to determine whether or not it is functioning properly before it is deployed for operation, which is where the system can be used.
Read more: brainly.com/question/20813142
I am not too happy to be a good man in my world but he is made me very very much and he is made me very very much and he is very much very good to him very much and he is very much very good to you very good and very much to be able for my kids with a little more money will not go back and you can do the greatest if he can be very much and you have no problem and then we do all the way that we are not the right answer but you have a question to do and you don’t have the right right answer the answer right back and he will not be very good I am very good and he is very very bad
Answer:
CCSA
Explanation:
CCSA is "Checkpoint Certified Security Administrator". This certification is best suited for Jonas.