Answer: $393.75.
Step-by-step explanation:
Multiply 5,625 by 0.07 to find the comission amount.
Answer:
A=4000, B=80, C=24
Step-by-step explanation:
You forgot to put the correct area model, I attached it to the answer.
We have the fact that Mountain Q is 4 times the height of Mountain P. That's the "4" we have in the left side of our model. It's like having a multiplication table, next to the "4" we have "A" and upper this we have "1000", the only thing we have to do is multiplify 4*1000=4000. The next letter we have is B and below it we have "320", we divided it by 4, 320/4=80. The last letter we have is C, and is below a "6", we only have to multiplify it by 4, 6*4=24.
At the end we only sum our
- A + 320 + c = 4344 (4 times the height of Mountain P).
- 1000 + B + 6 = 1086(the height of the Mountain P).
Answer:
x = 3/2 v - 3 (or x = 3v/2 - 3)
Step-by-step explanation:
v = 2/3 x + 2
v - 2 = 2/3 x
3/2 v - 3 = x
Answer:
Add 39499 plus 3499
Step-by-step explanation:
and get it
Step-by-step explanation:
9 × 1/2 = 4.5
8 × 1/2 = 4
hope it's helpful