Plan A: 30 + 0.01m
Plan B: 20 + 0.05m
in order for 2 plans cost the same, both need to be equal
so should be
20 + 0.05m = 30 + 0.01m
answer is D. last one
20 + 0.05m = 30 + 0.01m
The answer is a i think but if u get it wrong im sorry
Answer:
the second one
Step-by-step explanation:
cant be negative cuz if its negative the first line doesnt apply.