1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
umka21 [38]
3 years ago
13

Why is the cost of a software project not directly related to the cost of development?

Computers and Technology
1 answer:
DerKrebs [107]3 years ago
8 0

Answer:On average, the cost of a robust custom software project will range between $50,000 and $250,000, although some sources say the price of a hypothetical mobile app built by a large development company may reach $1,000,000.

Explanation:

You might be interested in
The waterfall model and spiral model are variations of SDLC. Do some research to find out what they are and explain how these mo
Radda [10]

Waterfall model and spiral model are used in software development life cycle or SDLC. Any software development process follows one of these models depending on the type of software and the requirements of the customer.

Waterfall model

This model is called as sequential model since it works in stages. The output of first stage becomes the input of the second stage.

The errors of the first stage can be rectified only when it is completed. This is time consuming and makes the process lengthy. Stage 1 is completed before stage 2 begins.

The six stages involved in waterfall model are Requirement Gathering and analysis, System Design, Implementation, Integration and Testing, Deployment of system, and Maintenance.

Spiral model

This model is implemented in iterations. It is also called evolutionary model.  

Initially a prototype of the system is prepared. Then, it is followed by development of small parts of the system.

These smaller parts are then assembled to produce the final system.

The four stages which form the spiral model are Identification, Design, Development and Evaluation and Risk Analysis.

The differences between the two models are summarized below.

1. Waterfall model works in linear method. Spiral model follows evolutionary method.

2. Errors and risks are discovered/ rectified after the stage is over. Errors and risks are discovered/ rectified earlier.

3. Waterfall model is suitable for small projects. Spiral model is suitable for large projects.

4. Requirements identification and planning is the initial stage in the waterfall model. Requirements identification and planning is done when needed, in the spiral model.

5. Waterfall model allows little to no flexibility in the system. Spiral model allows flexibility in the system.

6. Low flexibility makes the waterfall model more risky. High flexibility makes the spiral model less risky.

7. Waterfall model, overall, takes less time since requirements are clear. Spiral model is implemented when the requirements of the system are not clear and become clear through prototypes.

8 0
3 years ago
Dr. Joon asks her students how to insert a table in an Excel workbook. The students record the steps a chart. Which students lis
Leona [35]

Answer:

C

Explanation:

Both Table and Format as Table can be used to create a table

4 0
3 years ago
What is the importance of using the proper markup language?
Klio2033 [76]

the answer is D. without the right tags the content wont be accurately indexed

3 0
4 years ago
Read 2 more answers
1.6<br> What do you call the two parts of the lift that goes down a mine?
Likurg_2 [28]

Answer:

Sheave wheel and hoist cable

Explanation:

The sheave wheel is a pulley wheel that sits above the mine shaft. The hoist cable passes over the sheave wheel and then down the shaft of the mine. The sheave wheel reduces the sliding friction of the mine cable. The head frame is the structure that supports the sheave wheel.

7 0
3 years ago
What is force? what are the types of force ? Explain all with suitable examples<br>​
ad-work [718]
Force is a push or pull which is exerted on an objects. Types of Force are

Contact forces
Non contact forces or At a distance forces

Examples of Contact forces are:
Stretching of the spring of a balance
pushing of a pram
kicking of a football
Pushing the door
Hitting the ball etc are some examples of contact forces.

some types of contact forces are given in the list below:

Applied force
Normal force
Frictional force
Tension force
Air resistance force
Spring force
6 0
3 years ago
Other questions:
  • When seeking information on the internet about a variety of subjects, the most useful place to look would be
    8·2 answers
  • Selecting the option to control Widows and Orphans will prevent _________. A single line from appearing at the top or bottom of
    10·1 answer
  • When records are in ____ order, they are arranged one after another on the basis of the value in a particular field.?
    9·1 answer
  • Describe an application or a situation in which it is not convenient to use a linked list to store the data of the application
    12·1 answer
  • Is it better to meet online or offline<br> (Please answer QUICK)<br><br> Thanks :')
    5·2 answers
  • Consider the following classes: public class Vehicle {...} public class Car extends Vehicle {...} public class SUV extends Car {
    8·1 answer
  • 1
    5·2 answers
  • Check examples of a good work ethic. *
    6·1 answer
  • Identify the careers that require a college degree
    9·1 answer
  • What type of software is an antivirus?
    5·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!