1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Angelina_Jolie [31]
3 years ago
6

What is the solution to this system of equations, and what does it mean to the contractor? The solution (0, 20) tells the contra

ctor the minimum amount that can be charged. The solution (0, 500) tells the contractor the maximum amount that can be charged. The solution (25, 20) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options. The solution (20, 25) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.

Mathematics
2 answers:
Citrus2011 [14]3 years ago
5 0

Answer:C- the solution (25, 20) tells the contractor the number of hours on a job where the hourly rate is the same for both building options.

Step-by-step explanation:

oksano4ka [1.4K]3 years ago
3 0

The question is incomplete. Here is the complete question:

A contractor has two choices for billing a completed job.

· $500 flat rate, regardless of the number of hours worked

· $20 per hour worked

The graph shows the relationship between pay per hour and number of hours worked for both scenarios.

What is the solution to this system of equations, and what does it mean to the contractor?

A.The solution (0, 20) tells the contractor the minimum amount that can be charged.

B.The solution (0, 500) tells the contractor the maximum amount that can be charged.

C.The solution (25, 20) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.

D.The solution (20, 25) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.

Answer:

The graph is attached below.

C.The solution (25, 20) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.

Step-by-step explanation:

As per the graph, the x-axis represents the number of hours worked and the y-axis represents the rate in dollars per hour.

The hourly rate is given as $20.

The solution to the given lines drawn on the graph is the point of intersection of the two curves.

As we observe from the graph, the point of intersection of the two curves is at (25,20). The point tells the contractor that when the hourly rate is $20, then the number of hours worked will be 25.

So, when the hourly rate is same for both the billings, then the number of hours worked will be 25.

Hence, the correct option is (C).

You might be interested in
The price of jeans was reduced $6 per week for 7 weeks. By how much did the price of the jeans change over the 7 weeks?
Nataliya [291]
The price changed by $42 over the course of seven weeks
3 0
3 years ago
Read 2 more answers
Marta can vacuum the house in 30 min. It takes her daughter 45 min to vacuum the house. How long would it take them if they
Mamont248 [21]

Answer:

<h2>18mins</h2>

Step-by-step explanation:

This problem is on combined work rate

given that

Marta can vacuum the house in 30 min

then her rate= 1/30

Also, her daughter will take 45 min to vacuum the house

her  daughter's rate will be = 1/45

then the combined work rate is

1/30+1/45=1/T

30+45/30*45=1/T

75/1350= 1/T

1/18=1/T

This means that they will both take 18 minutes working together to vacum a house

8 0
3 years ago
Emmett bought 10 packages of cat food and 3 packages of dog food. Each package of cat food contained 10 cans, and each package o
xz_007 [3.2K]

Answer: Emmet bought 94 more cans of cat food than dog food.  

Step-by-step explanation:

4 0
3 years ago
Read 2 more answers
The average of a b c and d is p. If the average of a and c is q, what is the average of b and d in terms of p and q?
vodka [1.7K]
P - q i believe because
p = total average
q = average of ac
x = average of bd
p - q = x

4 0
3 years ago
Micaela bought for posters. A week later half of all her posters were lost during a move. There are now only 12 posters left. Ho
Nikolay [14]

Answer:24

Step-by-step explanation: If she bought x amount of posters and had 12 left after, you'd multiply 12 by 2 and get 24. Half of 24 is 12. So Micaela bought 24 posters.

5 0
3 years ago
Read 2 more answers
Other questions:
  • You've received an invoice for $3,000 with terms of 3/10, 1/20, n/30. How much will you have to pay if you pay the bill in 12 da
    15·1 answer
  • A machine cuts nets from flat pieces of cardboard. The nets can be folded into triangular pyramids used a pieces in a board game
    14·1 answer
  • Write a number sentence that equal 3/6
    13·1 answer
  • The scale on a road map indicates that 2 inches = 30 miles. How many inches would represent 120 miles on this road map?
    6·1 answer
  • A total of 250 people were surveyed about whether or not each person carries a cell phone. The results are shown below in the re
    10·2 answers
  • There are 3 islands A,B,C. Island B is east of island A, 8 miles away. Island C is northeast of A, 5 miles away and northwest of
    9·1 answer
  • Look at this equation 3(x+1)=3x=? which number can be placed in the box *the question mark* that would create an equation that h
    14·1 answer
  • Please help need ASAP
    7·1 answer
  • Greg enjoys jogging 4 times a week. On the first day he jogs 3 1/2 miles. on the second day he jogs 3 2/3 miles. on the third da
    10·1 answer
  • I dont understand this equation.
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!