Answer:
An arrow diagram
Step-by-step explanation:
Helps keep track of intricate relationships between variables. Specifies the phenomena of interest: independent, alternative, antecedent and intervening.
-Time on the bottom with an arrow
-Antecedent -> Independent -> intervening-> dependent
An arrow diagram is defined as a process diagramming tool used to determine optimal sequence of events, and their inter-connectivity. It is a network diagramming technique in which activities are represented by arrow, used for scheduling and to determine the critical path through nodes. The arrow diagramming method shows the required order of tasks in a project or process, the best schedule for the entire project, and potential scheduling and resource problems and their solutions. The arrow diagram lets you calculate the "critical path" of the project the flow of critical steps where delays can affect the timing of the entire project and where addition of resources can speed up the project.
One headed arrow connecting two variables= "X directly causes Y"
Answer:
116
Step-by-step explanation:
IT SAYS WHAT IS THE MEASUREMENT OF THE LAST ANGLE 116 WHAT THE LAST NUMBER.
Use the identity
sec^2x = 1 + tan^2 x
- so sec x = sqrt(1 + tan^2 x) then:-
tan x + sqrt( 1 + tan^2 x) = 1
sqrt ( 1 + tan^2 x) = 1 - tan x
1 + tan^2 x = 1 + tan^2x - 2 tan x
0 = -2 tanx
tan x = 0
x = 0, π
π is an extraneous root because sec 180 = -1
So the answer is 0 degrees
Answer:
161,084,000
Step-by-step explanation:
7 x 11,506,000 = 80,542,000
80,542,000 x 2 = 161,084,000