1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
SVETLANKA909090 [29]
3 years ago
7

A chef mixed oil and vinegar to make a salad dressing she made enough dressing to fill 6 plastic bottles each bottle has 4/8 cup

of olive oil and 2/8 cup of vinegar what was the total amount in cups of salad dressing the chef made?
Mathematics
1 answer:
Nataly [62]3 years ago
5 0
48 cups because there are 8 cups in a bottle and 8 times 6 is 48
You might be interested in
Can someone help me with part B? Thank you! Brainliest for correct answer!
Ivanshal [37]

Answer: The mean is 5

Step-by-step explanation:

If you add all of the numbers and divide by how much numbers there are (8), then you get 5. Then the mean absolute deviation is the number away from the mean.

So I will put the mean absolute deviation in order of the numbers

4 (1 away from mean), 3 (2 away from the mean), 4( 1 away from the mean), 5 (same number as the mean), 6 (1 away from the mean), 6(1 away from mean), 8 (3 away from mean), and, finally another 4 (1 away)

Hope this helps :)

3 0
2 years ago
Read 2 more answers
Using the net below, find the surface area
polet [3.4K]

Answer:

56 cm^2

Step-by-step explanation:

Surface area is just finding the areas of each face in a figure. As we are given a net of a figure, it is much easier for us to calculate it.

Area of square base (side^2)

4^2 = 16 cm^2

Area of ONE triangular face (1/2 x b x h):

1/2 x 4 x 5 = 10 cm^2

Multiply that by 4 because we have 4 triangular faces: 10 cm^2 x 4 = 40 cm^2

ADD all the areas of triangles and square:

16 cm^2 + 40 cm^2 = 56 cm^2

HOPE THIS HELPS

Have a nice day!

4 0
2 years ago
A company makes a profit of $50 per software program and $35 per video game. the company can produce at most 200 software progra
Neko [114]
Let x = software program
Let y = video game

x < 200 ; y < 300

x + y < 425

50x ; 35y

x = 200 ; y = 225
50(200) + 35(225) = 10,000 + 7,875 = 17,875

x = 125 ; y = 300
50(125) + 35(300) = 6,250 + 10,500 = 16,750

x = 175 ; y = 250
50(175)  + 35(250) = 8,750 + 8,750 = 17,500

It is more profitable to maximize production of software program when working within the limits provided.
4 0
3 years ago
Read 2 more answers
quien me ayuda explicando el proceso de realizar esta funcion cuadratica para encontrar el vertice y=−4x−5
irina1246 [14]

Answer:

-9

Step-by-step explanation:

8 0
3 years ago
Plz correct me if i'm wrong thx
Marianna [84]

Answer:

Your answer is correct

6 0
3 years ago
Other questions:
  • the fastest train in the us can travel 2.6 miles per minute.At that speed how far does it go in half an hour?
    7·2 answers
  • How do I do Radicals?
    7·2 answers
  • Can you explain how to do this?
    8·1 answer
  • Question is 15 points
    10·1 answer
  • marco is 6 feet 3 inches tall. There are 2.54 centimeters in 1 inch. What is marcos height in centimeters.
    10·2 answers
  • Allies plant has a height of 6meters. Radon’s plant grows 3/10 meters higher. How high does radon’s plant grow
    12·1 answer
  • The perimeter of a rectangle is 30 cm. If one of its sides is decreased by 3 cm and the other side is increased by 5 cm, the are
    8·1 answer
  • The y-intercept of the line whose equation is 3x - 2y = 6 is -3 2 6
    9·2 answers
  • Determine if the two triangles are congruent. If they are, state<br> the condition.
    9·1 answer
  • A function f(x)is graphed on the coordinate plane.
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!