Since the husband is dead, spousal privilege between them is broken and thus the woman can be compelled to testify. There are to privileges related to marriage; privilege for confidential marital communication, under this privilege, a spouse is not permitted to disclose confidential communications made between the couple and this privileges stands even after divorce and Spousal immunity which prevents a married person from testifying or witnessing against a spouse in a trial.
The most likely tool we can use to show these details of how long the project will take and which variances exist is "Gantt chart".
<h3>What is Gantt chart?</h3>
One popular graphic representation of a project timeline is a Gantt chart. It is a kind of bar chart that displays the beginning and ending dates of a program's various components, including its resources, planning, and dependencies.
Some characteristics of Gantt chart are-
- The Gantt chart is an visual aid for planning, controlling, and keeping track of particular activities and resources within a project.
- It consist of a task list with progress bars for each activity.
- It is the project management chart that is most frequently used.
- For tasks like creating motorways, bridges, and dams, as well as for software development and creating other products and services, heavy industries employ Gantt charts.
- The chart shows which tasks can be completed concurrently and which ones must wait until others have been performed in order to be started or finished.
- It can assist in locating potential bottlenecks and locating work that might have been left off the project schedule.
To know more about the Gantt chart, here
brainly.com/question/13067654
#SPJ4
Engineering controls safeguard employees by eliminating dangerous situations or by erecting a barrier between the employee and the risk. Examples include machine guards to protect the worker or local exhaust ventilation to capture and remove airborne pollution.
What is the difference between engineering control and administrative control?
Engineering controls could involve altering the weight of the products, adjusting the heights of the work surfaces, or getting lifting equipment. Administrative controls are workplace policies, practices, and processes that reduce the likelihood of risky situations for employees.
What are the basic principles of engineering controls?
- Redesigning a process to use less dangerous chemicals;
- Redesigning a piece of equipment to eliminate the source of high temperatures, noise, or pressure;
- Designing general ventilation with enough fresh outdoor air to improve interior air quality and generally to provide a safe, healthy environment.
- Redesigning a workstation to reduce physical stress and remove ergonomic dangers.
Learn more about engineering controls: brainly.com/question/5338020
#SPJ4
when does this take place like in the 1900