Answer:
Step-by-step explanation:
•y-intercept is the 200 pages she has to read to begin with
•x-intercept on day 16 means she has finished reading all the pages, there are
zero pages left
•there are 100 pages left after 8 days
• the line is straight (no change in slope) so the reading rate was consistent over the 16 days.
We add up all those numbers (excluding 30) and divide by the number of numbers (9). This results in 78.8 (round up to 79).
79-74 = 5. So the mean has increased by 5 points. (C)
Well i don't know if this will help but slope intercept form
y=mx+b
M-slope
B-Y intercept
and
(x,y)- would be any point on the graph and if you were to plug those points in for x and y the equation would solve if done properly
Answer:
The correct answer is 10 days.
Step-by-step explanation:
To fill a trench, 5 men work for 6 hours a day for eight days.
Total work hours required is given by 5 × 6 × 8 = 240 hours.
The same work is supposed to be done by 3 men working 8 hours a day.
Let these three men need to work for x days.
Therefore total work hour these group of three men gave = 3 × 8 × x = 24x hours
Therefore the work hour of both the group of 5 men and 3 men should be equal.
⇒ 24x = 240
⇒ x = 10
Therefore the group of 3 men have to work for 10 days to fill the trench.
Answer:
z = 9/2
Step-by-step explanation:
1/2z = 9 1/4?
z = 9/2
Explanation:
Simplify
9 x 1/4 → 9/4
Multiply 2 to both sides to cancel out the 2
1z = 9/4
Note: 1z is just z