1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
BabaBlast [244]
3 years ago
12

Which phase brings all the project pieces together into a special testing environment to eliminate errors and bugs, and verify t

hat the system meets all the business requirements defined in the analysis phase?
Computers and Technology
1 answer:
gladu [14]3 years ago
3 0

Answer:

Implementation

Explanation:

The implementation phase of any system design makes a system reality feasible, at this stage all other componenta of the system design outside of the systems in various fragmenta are brought together and coupled as one for efficient and perfect testing.

You might be interested in
Why a management-focused program provides a more appropriate learning path for you than a program based heavily on technical con
AlekseyPX
The program makes more money
3 0
3 years ago
Match each code snippet to its appropriate markup language name
Mazyrski [523]

Answer:

Please find the complete solution in the attached file.

Explanation:

8 0
2 years ago
Given three floating-point numbers x, y, and z, output x to the power of z, x to the power of (y to the power of z), the absolut
STALIN [3.7K]

Solution :

x = float_(input())

y = float_(input())

z = float_(input())

res1 = x**z

res2 = x**(y**z)

res3 = abs(x-y)

res4 = (x**z)**0.5

print('{:.2f} {:.2f} {:.2f} {:.2f}'.format(res1,res2,res3,res4))

Output is :

5.0

1.5

3.2

172.47 361.66 3.50 13.13

6 0
2 years ago
Round Robin Algorithm
Reil [10]

Answer:

Please check the attachment.

Explanation:

avg turnaround time = (38+7+42+33+18)/5= 27.6

avg waiting timee = (33+5+28+23+17)/5= 21.2

And its D, A C in Gantt chart at last and exit time are 33, 38 and 42 mentioned as last three in Gantt chart.

7 0
2 years ago
A developer wants to take existing code written by another person and add some features specific to their needs. Which of the fo
anzhelika [568]

Answer:

open-source

Explanation:

open-souce software allows any user to submit modifications of the source code

7 0
2 years ago
Other questions:
  • 9. The best way to insert an existing Excel chart into a document is to A. use the Object command. B. click the Insert tab and c
    6·2 answers
  • _____ separation strategies (e.g., attacking and sabotaging others) are used by those for whom co-cultural segregation is an imp
    5·1 answer
  • 25 POINTS HELP PLEASE IM TIMED
    15·1 answer
  • What is one of the first power tools you’ll need as electrician
    15·1 answer
  • Which of the following is a hardware component used to hold the BitLocker encryption key and ensures encrypted data is not acces
    5·1 answer
  • highlight the possible risks and problems that should be address during the implementation of information system process
    5·1 answer
  • A group of students is performing an investigation to measure how much liquid water is produced from a 10 L sample of snow. What
    6·1 answer
  • When must an Assured Equipment Grounding Conductor Program (AEGCP) be in place?
    13·1 answer
  • China sends a computer virus that shuts down telephone service in the United States. In retaliation, the United States hacks int
    13·1 answer
  • Pleaseeeee helpppppppp​
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!