Answer:
Option D
Explanation:
As both, the actual rate and actual hours exceed the standards rate and standard hours, both rate and efficiency variance will be unfavorable.
And considering that if the actual labor rate exceeds the standard labor rate and if the actual labor-hours exceed the number of hours allowed, the total labor flexible budget variance will be unfavorable. As the variance is the difference between the Standard Cost and Actual Cost. So if both Standard rate & Standard hrs. are more than actual rate & actual hrs., Actual cost will be more than standard cost i.e. the variance will be unfavorable
Option d is correct
Answer:
Unitary cost= $62.5
Explanation:
Giving the following information:
Predetermined overhead rate based on direct labor-hours to apply manufacturing overhead to jobs. At the beginning of the year, manufacturing overhead and direct labor-hours for the year were estimated at $50,000 and 20,000 hours.
Materials costs on the job totaled $4,000 and labor costs totaled $1,500 at $5 per hour.
First, we need to determine the allocated MOH:
Estimated manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Estimated manufacturing overhead rate= 50000/20000= $2.5 per direct labor hour
Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base= 2.5* (1500/5)= $750
Total cost= 4000 + 1500 + 750= $6,250
Unitary cost= 6250/100= $62.5
This measures frequency, as it states that number of times the target gets to see the message
Answer:
the issue price is $88 per share
Explanation:
The computation of the issue price is shown below:
= (Common stock + paid in capital) ÷ (Number of common shares issued)
= ($3,600,000 + $36,000,000) ÷ 450,000 shares
= $39,600,000 ÷ 450,000 shares
= $88 per share
Hence, the issue price is $88 per share
Answer:
Total spoiled units = 7000
Normal spoilage total = 3500
Abnormal spoilage total = 3500
Total cost per equivalent unit = $3.80
Cost of goods manufactured = $224,000
Ending WIP = $201,165
Explanation:
Kindly check attached pictures