Let the numbers be a and b and b>a
2a=3b and 3(b-a)=2(b-a)+13
Solving the first for a:
2a=3b
a=3b/2, now using this value of a in the second equation gives you:
3(b-3b/2)=2(b-3b/2)+13 upon performing indicated operations.
3b-9b/2=2b-6b/2+13 making all terms have a common denominator of 2
(6b-9b)/2=(4b-6b+26)/2 multiplying the whole equation by 2
6b-9b=4b-6b+26 combining like terms
-3b=-2b+26 adding 2b to both sides
-b=26 dividing both sides by -1
b=-26, since a=3b/2
a=3(-26)/2
a=-39
So the numbers are -39 and -26
check...
2a=3b becomes:
2(-39)=3(-26)
-78=-78
3(b-a)=2(b-a)+13 becomes:
3(-26--39)=2(-26--39)+13
3(13)=2(13)+13
39=26+13
39=39
correct :P
Step-by-step explanation:
which one are you asking for???
Answer:
What figure lol
Step-by-step explanation:
Answer:
x < -8
Step-by-step explanation:
Step 1: Divide both sides by -0.5 and flip the inequality sign.
Therefore, the answer is x < -8.
Answer:
It will take 4.5 hours for rick to complete the job.
Step-by-step explanation:
Given:
Time taken by Phil to paint the garage = 12 hours.
It means that for each hour he does =
of the job.
.
Time taken by Rick to paint the garage = 10 hours.
It means that for each hour he does =
of the job
.
If they work together for 3 hours,
Phil does job in 3 hrs = 
Rick does job in 3 hrs = 
.
So in three hours of working together job done = 
.
This means job of the painting entire garage have been done 0.55 of it.
1 - 0.55 = 0.45.
So there is 0.45 job left
At this point Phil quits and Rick presses on by himself. Since he does 1/10 of the garage every hour
Let T represents the time that Rick needs to complete the job after Phil leaves.
Hence, 
Hence it will take rick 4.5 hours to complete the remaining job.