Answer:
a. Grand Mean = 2.799
b. Standard Deviation = 0.01387
c. Standard Error = 0.0016
d. The range with a Z score of 3 = (2.75739, 2.84061)
Step-by-step explanation:
a. Grand mean :
Given that
Sum of 80 values = 223.91
Total observation = 80
Grand mean = 223.91/80 = 2.799
b. With the excel command "STDEV[range of cells]", we get the standard deviation as = 0.01387
c. Standard error = Standard deviation / root of n

d. The range with a Z score of 3 :
lower limit = mean - (3 * SD) = 2.799 - (0.04161) = 2.75739
upper limit = mean + (3 * SD) = 2.799 + (0.04161) = 2.84061
Answer:
see below
Step-by-step explanation:
Each point moves to half its previous distance from P. It is probably easier to count grid squares on the graph than it is to do the math on the coordinates.
If you're doing the math on the coordinates, it is convenient to use P = (0, 0), then multiply each of the coordinates of A, B, and C by 1/2. For example:
A' = (1/2)A = (1/2)(8, 4) = (4, 2)
Answer:
x = 105 degrees.
Step-by-step explanation:
The small polygon is a regular hexagon so each internal angle = 120 degrees while the large polygon is a regular octagon with internal angle =
135 degrees.
So angle x = 360 - ( 120 + 135)
= 360 - 255
= 105 degrees.
Note we use the fomula T = 180( n - 2) to find total internal angles in an n sided polygon. So for hexagon T = 180(6-2) = 180*4 = 720 so each internal angle in a regular hexagon = 720/6 = 120 degrees.
Answer:
1. 9 raised to the third power is 729
2. 4 raised the the power of 1 is 1
Step-by-step explanation:
9*9= 81*9=729
4*1=4
I’m pretty sure that it is the 3 or C option.