Using linear function concepts, it is found that:
a) The initial value is of 3 and the rate of change is of 20.
b) The rate of change means that for <u>each hour, the cost increases by 3 Dhs</u>, while the initial value means that <u>a flat fee of 20 Dhs is paid</u>.
<h3>What is a linear function?</h3>
A linear function is modeled by:

In which:
- m is the slope, which is the rate of change, that is, by how much y changes when x changes by 1.
- b is the y-intercept, which is the value of y when x = 0, and also can be considered as the initial value.
In this problem, the function that gives the charge C for renting a bicycle for h hours is:

Item a:
Comparing to the standard function, we have that:
- The initial value is of 3 and the rate of change is of 20.
Item b:
The rate of change means that for <u>each hour, the cost increases by 3 Dhs</u>, while the initial value means that <u>a flat fee of 20 Dhs is paid</u>.
You can learn more about linear function concepts at brainly.com/question/24808124
Answer:
Step-by-step explanation:
Answer:
12d+3
Step-by-step explanation: multiply 3x4d and 3x1 and you get 12d+3
Set up an equation to solve.
70% of original price equals $550, the amount Susan is paying.
0.70x = 550
Answer:
0.8413 = 84.13% probability that a bolt has a length greater than 2.96 cm.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Mean of 3 cm and a standard deviation of 0.04 cm.
This means that 
What is the probability that a bolt has a length greater than 2.96 cm?
This is 1 subtracted by the p-value of Z when X = 2.96. So



has a p-value of 0.1587.
1 - 0.1587 = 0.8413
0.8413 = 84.13% probability that a bolt has a length greater than 2.96 cm.