1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
marshall27 [118]
4 years ago
15

How do you distribute 2(x + 5)

Mathematics
1 answer:
Cloud [144]4 years ago
3 0

Answer:

2x+10.

Step-by-step explanation:

*2(x+5)

--> Ok first you're gonna distribute the 2...

*2->(x+->5)

--> That would make this problem to:

* 2x+10

** To explain further you multiply 5 by 2 to get 10. And the x just drags the 2 over.

You might be interested in
Which graph represents an exponential function?
ruslelena [56]

Answer:

the linear graph man

please why ask ezzy questions

7 0
3 years ago
What are the mensure of 1 angle and 2 angle? Show ur work or explain
STatiana [176]

Answer:

angle 1 = 105º

angle 2  = 75º

Step-by-step explanation:

angle 2  = 75º

corresponding angle to the 75º angle

angle 1 = 105º

it's supplementary to angle 2

180 - 75 = 105

6 0
3 years ago
5x + 3<br> ----------<br> 15 <br><br><br> How is this solved?
Bas_tet [7]
This expression can't be simplified any further be as there is no common factor for the numerator and the denominator.
8 0
3 years ago
Find y: 2y+(y+10)+50=180
LuckyWell [14K]
Simplifying
y+10+2y+50=180

reorder the terms:
10+50+y+2y=180

combine like terms: 10+50=60
60+y+2y=180

 da da da da dah 

and you get

y=40 simplifying
7 0
4 years ago
John can clear a lot in 1.5 hours. His partner can do the same job in 4.5 hours. How long will it take them to clear the lot wor
Crank

Answer:

1 hour and 7.5 minutes

Step-by-step explanation:

We have the following information:

Jose makes 1 / 1.5 of the job per hour. It is his rate of work in addition to that the partner makes 1 / 4.5 of the job per hour. It is his rate of work.

Thus:

1 / 1.5 + 1 / 4.5 = 1 / x

0.8898 = 1 / x

x = 1 / 0.8888

x = 1.125

Hence, it will take 1 hour and 7.5 minutes for them to complete the job working together.

4 0
3 years ago
Other questions:
  • If the gradient of line A is 4 what is the gradient of the line which is perpendicular to A
    14·1 answer
  • Find the product of (x-4) (x+5)
    15·2 answers
  • 19/24 as a decimal rounded to the nearest hundredth
    6·2 answers
  • What is the simplified form of the expression 1/2 (2x + 6).
    12·2 answers
  • The profit that the vendor makes per day by selling x pretzels is given by the function P(x) = -0.004 x^2 + 2.8x - 350. Find the
    7·1 answer
  • The Wayside Hotel charges its guests $1 plus
    10·1 answer
  • Amalia is scuba diving at a position 24.25 feet below sea level. She descends 0.5 foot each minute for 25 minutes. What is Amali
    11·1 answer
  • The PE classes collected canned food for a food drive last Thanksgiving. The goal was to collect 600 cans. They collected 1800 c
    9·1 answer
  • Geomtry plzzzzz help. me
    6·1 answer
  • A fair dice is rolled.
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!