He doesn’t have enough for both to be on at a time but if the cars are on without the train the cars will take up 2.4 meters leaving them with an extra .1 meters of length
The total snowfall throughout the day is the expected value of the distribution.
The estimated total snowfall during the day is 30 inches
Start by calculating the average rate of snow collected on that day.

This gives

Divide 7.5 by 6

There are 24 hours in a day.
So, the total snowfall is:

This gives

Multiply

Hence, the estimated total snowfall during the day is 30 inches
Read more about expected values at:
brainly.com/question/13005177
Answer: Triangle
Step-by-step explanation: If you cut it vertically, the base is changed into a triangle.
Hope this helps!
<span>B. It is the number of edges on one base plus 2.</span>
First step is to find what should be the required total of sum of Score after fourth test, to identify how much more or less she need to score in his fourth test.
Since Mean = (Sum of Scores)/number of test
using above formula we determine what is the required sum of score.
82 = (Sum of Scores)/4
⇒ 82 × 4 = 328
So in four test she should have score total as 328
So Score require in fourth test = Required Score Total - (total score in 3 tests)
= 328 - ( 72 + 97 + 82 ) = 77
So she need score of 77 to be at mean of 82 after fourth test and get qualify for the team