800 because 20*4*10=800 which means he works 80 weeks a month for 10 months
Answer:
38.11%
Step-by-step explanation:
Given that:
Mean (μ) = 75, standard deviation (σ) = 5
Z score is a measure in statistics to determine the variation of a raw score from the mean. It is given by the equation:
To calculate the percentage of students scored between a 73 and 78 (C grade), we need to find the z score for 73 and then for 78.
For x = 73, the z score is:
For x = 78, the z score is:
From the probability distribution table:
P(73 < x < 78) = P(-0.4 < z < 0.6) = P(z < 0.6) - P(z < -0.4) = 0.7257 - 0.3446 = 0.3811 = 38.11%
9514 1404 393
Answer:
(-3, 3)
Step-by-step explanation:
The blanks are trying to lead you through the process of finding the point of interest.
__
The horizontal distance from T to S is <u> 9 </u>. (or -9, if you prefer)
The ratio you're trying to divide the line into is the ratio that goes in this blank:
Multiply the horizontal distance by <u> 2/3 </u>. (9×2/3 = 6)
Move <u> 6 </u> units <u> left </u> from point T.
The vertical distance from T to S is <u> 6 </u>.
Multiply the vertical distance by <u> 2/3 </u>. (6×2/3 = 4)
Move <u> 4 </u> units <u> up </u> from point T.
__
Point T is (3, -1) so 6 left and 4 up is (3, -1) +(-6, 4) = (3-6, -1+4) = (-3, 3). The point that is 2/3 of the way from T to S is (-3, 3).
4/15, 5/9 and 3/5.
Hope this helps! :)
Answer:
n= 27
Step-by-step explanation:
n+6+2n+3=90
3n=81
n=27