Quick question before I answer: Did he have to pay $2,399 when he signed the lease, or was that just how much he had to pay in total over the course of 36 months?
In unit of batches over days, let r be the planned rate and R be the actual increased rate. The difference between R and r is described as 10 shirts per day.
R-r=10
Rate Time Batches
Planned r 8 1
Actual R 7 1
![\left[\begin{array}{c}r=1/8&R=1/7&R-r=HowManyBatchesInTenShirts\end{array}\right]](https://tex.z-dn.net/?f=%5Cleft%5B%5Cbegin%7Barray%7D%7Bc%7Dr%3D1%2F8%26R%3D1%2F7%26R-r%3DHowManyBatchesInTenShirts%5Cend%7Barray%7D%5Cright%5D)
, the number of batches equivalent to 10 shirts.

OneBatch=560*Shirts
Hope This Helps!!!
If you are comparing the triangles the answer is D
Standard form:
5,098,000
Scientific notation.
1) only 1 digit should be before the decimal point.
5.098000
2) only non-zero number must be part of the coefficient. the rest are included in the base of 10.
5.098 x 10^6 Choice D.
Exponent is the number of times the decimal moved from its original placement to its place after the 1st digit.